My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:56:43 PM
Creation date
3/24/2020 4:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRG MENTAL HEALTIDEPARTMENT <br /> oP°�1N SAN JOAQUIN COUNTY <br /> ). '•OG <br /> _•; tUnit Supervisors <br /> Donna K.Heran,R.E.H.S. 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> 1° X Director <br /> Al Olsen,R.E.H.S. Stockton, California 95202 Mike Huggins,R.E.H.S.,R.D.I. <br /> c•, r <br /> Telephone: (209)468-3420 Douglas W.Wilson,R.E.H.S <br /> . <br /> Program Manager Margaret Lagorio,R.E.H.S. <br /> Laurie <br /> A.Cotulla,R.E.H.S. Fax: (209)464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br /> San Joaquin County Environmental Health Department (EHD) has established the following guidelines to <br /> assist you in the completion of your construction project. The guidelines specify the construction and <br /> monitoring criteria necessary to complete our review of your proposed underground storage tank (UST) <br /> system. <br /> 1. Sl1gMITTAL OF PLANS <br /> INSTALLATION: <br /> a. Submit 3 complete sets of drawings illustrating the locations of all existing and proposed <br /> structures, including existing UST(s), in non-erasable print to EHD. Upon approval, one set <br /> will be retained by EHD and the other two will be returned. <br /> b. Include equipment and material specification sheets and manufacturer's brochures <br /> describing field testing procedures, operating and monitoring systems and listing numbers <br /> or other evidence of a nationally recognized testing organization approval. All proposed <br /> leak detection methods and equipment must meet the requirements specified in 40 CFR <br /> 280.40 and have been reviewed by the State Water Resources Control Board Staff. <br /> C. All interstitial monitors must perform according to manufacturer's standards, and must be <br /> tested annually in accordance with section 2630 (d), California Code of Regulations <br /> (CCR), Title 23 Waters, Division 3, Chapter 16. <br /> d. Include a detailed monitoring and response plan in accordance with section 2632 (d) (1) & <br /> (2), CCR, Title 23 Waters, Division 3, Chapter 16. <br /> e. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from below grade to finish grade. <br /> f. Submit a completed "EHD Service Request" form and the State Water Resources Control <br /> Board "Facility Permit (A)" and "Tank Permit (B)" application forms. <br /> SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a result of a leaking <br /> UST system it is the responsibility of the owner or operator to submit a workplan to EHD <br /> Site Mitigation Unit prior to initiating any assessment or remediation activities. To <br /> minimize delays, a Corrective Action Plan may be submitted concurrent with tank closure <br /> or installation plans. Address one copy of the Corrective Action Plan to the Site Mitigation <br /> Unit for review. For further assistance contact the Site Mitigation Unit at (209) 468-3450. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.