CU
<br /> Z
<br /> w.[1
<br /> w [1
<br /> � 0to<
<br /> KEYNOTES a w N
<br /> z i _
<br /> LONGEST PIPE RUNS, A5 SHOWN 1, NEW UNDERGROUND STORAGE 7ANK5 (USTs). DOUBLE-WALL FIBERGLASS REINFORCED PLASTIC 0 X Z N;
<br /> - -- (F.R.P.) BY XERXES, WET ANNULAS. ONE AT 30K 01 OCTANE UNLEADED GASOLINE. ONE AT 21K Z ® lu1 m m
<br /> SPLIT INTO 15K el OCTANE UNLEADED GASOLINE, 6K DIESEL. o m
<br /> REG. UNLD. GASOLINE - 121 FT.
<br /> 2. NEW (N) TANK VENT RISERS ON RISER RACK. INSTALL LISTED FLEX CONNECTORS AT BASE AND � � U (�
<br /> SUP. UNLD. GA5 - 126 FT. CONNECT TO TANK VENT PRIMARY PIPING, WITHIN CONTAINMENT / TE SUMP. 01 L4
<br /> ' DIESEL - 115 FT. 3, NEW MONITORING SUMP, W/ VENT PIPING CONTAINMENT TERMINATION FITTINGS. �
<br /> TANK VENTS - 4. NEW 2"4, FIBERGLASS REINFORCED PLASTIC (RR.P.) TANK VENT LINES W/ 3"0 CONTAINMENT PIPING, W
<br /> SLOPE SACK TO TANKS ,4T 1/81" P#=R FOOT, MINIMUM.
<br /> 5. . NEW GILBARCO 3+1 BLENDER DISPENSERS ON NEW CONTAINMENT / SHEAR VALVE SYSTEMS, W/
<br /> FLOAT SWITCH SUMP PROBES, TYPICAL OF 6. PROVIDE CONDUIT, SEAL-OFFS AND WIRE PER MNFR:
<br /> W €NSTALLATION PROCEDURES.
<br /> -- -- -- -_ --o-- W 6. NOT USED
<br /> W0 0 �
<br /> -I. NEW 3"0 F.R.P. PHASE 11 VAPOR RECOVERY PIPE W/ 4"0 CONTAINMENT PIPING FROM DISPENSERS TO � �
<br /> -"' - -- MARKrT 16 2 3 G,4SOLINE TANKS. SLOPE Ta T,4NKS AT i/5" PER Fool, MIN. Z 0 LU
<br /> 8. NEW 2"0 F.R.P. PRODUCT PIPE LLJ/ 34, F.R.P. SECONDARY CONTAINMENT PIPE. SLOPE TO TANKS AT W (� � > �[ O u-
<br /> o e a o 0 15 9 12 1 � 4 20 1/8" PER FOOT, MIN. W -= U > CIA
<br /> U
<br /> f , X m
<br /> O
<br /> 1-I a)9. TANK ANNULAR RESER, W/ HYDROSTATIC PROBE ANIS MANWAY, TYPICAL OF 2. O (Q cp 11 U
<br /> LU 10. NEW AUTOMATIC TANK GAUGES LU/IN TURBINE SUMP, TYPiGAL OF 3. _ }- rs r
<br /> I F.S.
<br /> (,� � 1.x.1 r m Ql wo ea A !I� ! ,;'•[ 11. SUBMERSIBLE TURBINE PUMP (5TP) TYPICAL Cr- 3 W/IN F.R.P. SUMP W/ FLOAT SWITCH SUMP PROBE Coln , q f--
<br /> LID, AND 3111 MANWAY. AUTO STP SHUTDOWN ON PROSE ALARM AND IF ANY OF THE MONITORING u
<br /> ' SYSTEMS FOR THE PIPING FAIL OR'ARE DISCONNECTED. Q -(p U
<br /> W 14 i I ;; ; � � �O 12. TANK FILL ASSEMBLY W/ 5 GALLON (MIN.) FILL CONTAINMENT (TYPICAL OF 3) AND 5 GALLON (MIN.) m ,�
<br /> CONTAINMENT FOR AT PHASE I VAPOR RECOVERY AT GASOLINE TANKS (TYPICAL OF 2), W/1N F.R.P. Q) �
<br /> ! I I ! I 3
<br /> I0� , ' I , SUMP, W/ FLOAT SWITCH SUMP PROBE, AND MANWAY ASSEMBLY.
<br /> Z 18 5 I 1 ,� I ' 13. BACKFILL TRENCHES W/ PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY COVER ,AND PAVING lu
<br /> BASE. PROVIDE CONCRETE 4"' THICK MIN, OVER PEA GRAVEL. U
<br /> a o e ti € I J
<br /> 14. NEW CONCRETE DRIVE SLAB, t-tIN€MUM 6" THICK W/ 04 BARS AT 18" O.C. BOTH WAYS, OVER 3" OF 3/4"
<br /> CRUSHED ROCK OVER AGG. 1545E, REFER TO CxEOTECHNICAL REPORT AND CIVIL ENGINEERING
<br /> IL.__ -__ ___ -__ _._ -_---- `��. ' O SHEETS, TYPICAL.
<br /> 15, NEW 9" THICK, MINIMUM, GONCRBTE TANK SLAB W/ 04 REBAR AT 18" O.C. BOTH WAYS. REFER ALSO
<br /> a 10 11 TO GEOTECHNICAL REPORT AMD CIVIL ENGINEERING SHEETS.
<br /> -- - -- 16. NEW PETROLEUM PANELS, CONTROLS, MONITOR CONTROLS AND ALARM, LOCATED IN MARKETS LU
<br /> 5LECtRICAL ROOM. w
<br /> a o F.H.
<br /> - [�
<br /> F'H' 11, NEW EMERGENCY SHUT-OFF (ESO) W/ VISIBLE SIGN, SEE GENERAL NOTES. CONFIRM LOCATION(S). Q_
<br /> 18, NEW CANOPY, 15Y OTHERS, REFER TO ARCH/CIVIL SHEETS, FOOTINGS BY PETROLEUM CONTRACTOR
<br /> (PC-) PER APPROVED CANOPY DRAWINGS. lu
<br /> P A R K S T R E E T
<br /> I9. NEW GONG. FILLED BOLLARDS„ TYPICAL. 6" SQ., 42" HIGH AT AUTO ISLANDS.
<br /> - - - - - - -- -- -- - ----- - - -_ -- - - - - - --- - --- _ - - - -- --�-- - - - - - - ---�--- - - _ _ - - - _ _ _ .� �..__ - - -- -
<br /> f
<br /> 20. NEW AIR / WATER UNIT. WATER t AIR SERVICE SY G.C.. CONFIRM LOCATION.
<br /> 21, CONTRACTOR SHALL PAINT ALL EXPOSED METALS, UNLESS PREFINISHED, W/ SUITABLE PAINT IN xY
<br /> APPROVED COLORS.
<br /> Z j1.j , I
<br /> 22, PIPING IS SHOWN SCHEMAT€C, SND MAY BE EXAGGERATED FOR DRAFTING CLARITY. VARIATIONS {''«
<br /> Q ZN �- S
<br /> DUE TO FIELDCONDITIONS FOUND ARE EXPECTED. UJ +, w
<br /> + CN
<br /> Z
<br /> cs) � n '15
<br /> GENERALNOTESpao
<br /> P E T R O L E U M S I T E PLAN A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE WITH UFC STANDARD 10-1 U Z ti
<br /> AND AS OTHERWISE REQUIRED BY ARTICLE 19 (UFC I901.5.3) INSTALL 4T LEAST TWO PORTABLE � lU �/ 2':3
<br /> SCALE, i" = 20' (USE GRAPHIC SCALE FOR REDUCED PLATS) FIRE EXTINGUISHERS (F.E.) W/ A MINIMUM RATING OF 4-440-5,-CAS SHOWN. THESE EXTINGUISHERS O C'Alh' ,
<br /> TO BE AFFIXED TO A LOCATION ON A MOUNTING BRACKET OR IN A FIRE EXTINGUISHER CAMINET: Q O Fa
<br /> 0 20 40 50 5. A CLEARLY LABE
<br /> ,ALED, MANUALLY OPERATED PUMP MASTER SWITCH SHALL BE PROVIDED IN AN 1= U J� U � 6?�� ' SAF
<br /> APPROVED LOCATION WAN 100 FEET, BUT NOT NEARER THAN 20 FEET TO, ANY DISPENSER. WHERE �
<br /> SUCH MASTER SWITCH IS NOT VISIBLE FROM ALL DISPENSERS, THE LOCATION THEREOF SHALL BE
<br /> INDICATED BY APPROVED SIGNS, SIGNS IDENTIFYING THE PUMP MASTER SWITCH SHALL BE nl �`
<br /> LABELED "EMERGENCY FUEL SHUTDOWN DEVICE". THE MASTER SWITCH ON ALL INDIVIDUAL PUMP r
<br /> CIRCUIT SWITCHES SHALL BE SET IN THE "OFF" POSITION BEFORE CLOSING THE STATION FOR
<br /> BUSINESS AT ANY TIME. (UFC 5201.5.3)
<br /> G. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER MANUFACTURER'S
<br /> INSTRUCTIONS, APPLICABLE CODES AND STANDARDS, THE PLANS. AND SPECIFICATIONS, AND
<br /> EQUIPMENT LISTS FUELING SYSTEM LOCAL AGENCY REQUIREMENT'S.
<br /> Mf` D1 IAC G OO MI ® �40QGQC C TTIaf�G� Tl'La[ 91 G��lr�J04�G� 7"%Hvl 'TROM D. TANK 4 DRIVE SLAB CONCRETE SHALL BE CAPABLE OF PASSING A MINIMUM COMPRESSIVE
<br /> (1) XERXES 30000-10'DW 30,000 GALLON DOUBLE WALL FIBERGLASS (1) VEIFDER ROOT 848250-122 TL5-35,OR BIR TANK MONITOR CONSOLE W/ (2) OPW P0(o5215EVR-16,4031RT052 MULT-PORT 3111 SPILL CONTAINMENT STRENGTH OF 2500 psi AFTER: 28 DAYS, INCLUDE 5 LBS. OF LAMPBLACK PER CUBIC YARD, AND
<br /> (10 FT. ) W/ (2) 42" FRP COLLAR, (2) ACR 42" X 60" TURBINE ENCLOSURE PRINTER MANHOLE W/ 1'0" PORT SPACING SHALL OTHERWISE FOLLOW THE CONCRETE DESIGN 45 SPECIFIED 1N THE CIVIL/ARCH DOCUMENTS.
<br /> (1) WITH LID, ADHESIVE KT, (i) 22" MANWAY, (3) 4" M/W FITTINGS (3) 4" NTP (1) VEEDER ROOT 330160-102 (SLD SOFTWARE ENHANCEMENT MODULE (1) OPW P465118EVR164031RT051 37" DIA MULTIPORT W/ I6°' PORT EXPANSION JOINTS AT DRIVE .AND TANK SLABS SHALL BE SEALED W/ FUEL COMPATIBLE
<br /> TANK FITTINGS, RESERVOIR / BRINE, FACTORY FILLED (1) VEEDER ROOT 330260-401 G-51TIE DIM SPACING (DIESEL) MATERIALS.
<br /> (1) 1 EEDER RooT 331,x63-100 100' CzIL5ARCa G-SITE CABLE (2) DPW 61VS,4-1020-EVR VAPOR SWIVEL ADAPTERS, BRONZE
<br /> (1) XERXES 20000-10-MCT 12,000 X 8,000 GALLON DOUIBLE WALL C1) �EEI ER ROOT 330160-080 PRES. LINE LEAK SOFTWARE (3) OPW 618400-1020-EVR FUEL :�Iu1VEL ADAPTER LOW PROFILE, E. CONFIRM FUEL SYSTEM COMPONENT LOCATIONS ,4RCHITURAL AND CIVIL ENGINEERING�s SHEETS_ - --- _ -
<br /> FIBERGLASS (10 FT. 0) W/ (4) 42" FRP COLLAR, (2) ACR 42" X 6O" (1) vEEDER ROOT 330843-001 SIX-jNf:,UT PRES. LINE LEAK MODULE BRONZE
<br /> (2) 22" MANWAY C6) 4" CI) VEEDER ROOT 330314-001 THREE-OUTPUT PRES. LINE LEAK MODULE (S) OPW FSA-400 FACE SEAL ADAPTER G.C. - GENERAL CONTRACTOR
<br /> TURBINE ENCLOSURE (1) WITH LID, ADHESIVE KIT, ,
<br /> M/W FITTINGS (6) 4" NTP TANK FITTINGS, RESERVOIR / BRINE, FACTORY (3) ,/EEDER ROOT 848480-001 FRES. LINE LEAK DETECTOR WITHOUT (3) oPW 6180-410c-EVR 4° OVERFILL VALVE, 120° UPPER AND 102" P.C. - PETROLEUM CONTRACTOR �
<br /> FILLED 5WIFTCHECK VALVE LOWER TUBE F.E. - FIRE EXTINGUISHER Q
<br /> (1) VEEDER ROOT 329356-.002 FOUR-INPUT TANK f ROBE MODULE (3) OPW o1JSK-4 f00-4400JACK SCREWW ASSEMBLY, C,4R8 61S0
<br /> �M tl 1 [�I;3�0f3 L pNJlp� (3) `,/EEDER ROOT 329358-001 E IGHT`-SENSOR MODULE INSTALLATION AS
<br /> (3) REDJACKET POV2 2 HP FIXE1a SPEED, VARIABLE LENGTH TURBINE (1) VEEDER ROOT 329359-001 FOUR OUTPUT RELAY (2) OPW VPN4X4 4" NIPPLE, 4" LENGTH (VAPOR BUCKET)
<br /> (3) REDJACKET 065-126-3 21 1/2" RISER (3) '/EEDER ROOT 841390-XXX X' MAG I TANK INVENTORY PROBES (3) OPW VPN4X5 4" NIPPLE, 5" LENGTH (FILL BUCKET) BUILT
<br /> (3) REDJAGKET RvP-IQ CONTROL BOX (2) `/EEDER ROOT 841B600-000 GASOLINE MAG INSTALL KITS (5' (3) OPW 634TT-X085-EVR 4" FUEL, TOP SEAL GAP >-o�
<br /> w
<br /> (3) REDJACKET P-150TROL DISPENSER HOOK ISOLATION BOX CAB LE) (2) OPW 1�1IT--1065-EVR VAPOR, TOP SEAL CAP C
<br /> a a
<br /> PETROLEUM SHEEN" INDEX �C,�'� CC✓� '� ' �o��N
<br /> (1) FEEDER ROOT 849600-001 DIESEL MAG INSTALL KITS (5' GABLE) (3) OPW 233VM-6045 4 X 3 X 2 EXTRACTOR u o z
<br /> ®0�5I�C nM�LO � (3) ?-IORRISON 305XPA-1200AK 4" TANK MONITORING CAP/ADAPTER C2) HUSKY 4885 2" PRESSURE VACUUM VENC VALVE Ct+-TREAD ON) - I�/� /C� z -' I
<br /> I A GO NC300NL1 ENCORE SELECTABLE BLENDER 3+I (40.5" COMB (1) OPLU-23-0033 VENT CAP Z ' © °��!
<br /> (6) Cs LI3 R E
<br /> O (13) vEEDER-ROOT "I94380-208 5UMF FLOAT SENSORS (12' CABLE) (9) TITEFLEX 110165-32-0240 2" X 24" MXMS FLEX CONNECTOR PET-1 PETROLEUM SITE PLAN, NOTES �U = Q ���o tu o W �
<br /> FRAME) 4-GRADE, 4-HOSE ELECTRONIC DISPENSER, BALANCE VAPOR
<br /> PIPING (2) '/SEDER ROOT "(94380-301 SINGI-E FLOAT HYDROSTATIC SENSOR (PRODUCT) W
<br /> (3) FI5-FL-36-5K FIBRELITE 36" COMP051TE MANHOLE PET-2 TANK 65CTI(ON, SLAB PLATS q �C� . -- J J W o a a Q
<br /> FUEL USLAmn 7QEN l3) FIB-FLSK-96 FIBRELITE 9-1/2" SKIRT ty� 4�4 �ti �- /r� �"'
<br /> HOSES,ES, NOMz'�f ES, AND Co3Gd1�QO�G��/i /��� V
<br /> (12) EMCO WHEATON 44005-002 COAX BALANCE NOZZLE (6) TOTAL CONTAINMENT D1=4022 DE1EP DISPENSER SUM'S (2) POMECO 6110-18WT 18" WATERTICxHT MANHOLE PET-3 PETROLEUMI SYSTEM DETAILS a �"
<br /> ,40004 5IHEAR VALVE MOUNTS (3) JOMAR 100-105 2" BALL VALVE �t b jU W o V
<br /> C12) HUSKY 336 0V1� SAFE-T-3:3REAK (18) TOTAL CONTAINMENT $
<br /> C12) GOOD YEAR CxY12"P 12" MAXXIM PREMIER COAX WHIP HOSE (6) TOTAL CONTAINMENT 58422EY YA�POR SHEAR VALVE MOUNTS (1) BRAVO 15-500-JP-F3S-B 3 VENT BOX
<br /> PET-4 PETROLEUM ELECTRICAL 131TE PLAN sl ZJU
<br /> a o C)o
<br /> (12) GOOD YEAR GYS'PP-28 8' MAXXIM PREMIER COAX WITH VENTURI wo
<br /> (15)OPW 108HMP-5830 1-1/2 EMERCxE,NGY VALVES (I) BRAVO R6-500-JP-36 VENT RACK !���,OF � �' W o lzu
<br /> (12) OPW IIA-0100 GREEN AUTO NOZZLE (6)OPW-&a0Vsp-10,01 VAPOR SHEAR VALVES C�, a N o u
<br /> (12) OPW SG-0100 GREEN 3/4" SPLASH GUARD C24, TITEFLEX 110165-24-0120 11/2,, X 12 MXMS FLEX CONNECTORS (DOES NOT INCLUDE P.O.S. EQUIPMENT, CONTROLLERS.) I`'ET-5 GENERAL C',ONDITIONS, WORGSCOPE o
<br /> (12) HUSKY 3360 3/4" SAFE-T-BREAK (24, PDM-6"X6'X.188 6" X -11 LONG SQUARE BOLLARDS
<br /> N U C12) THERMOID 2246-3484-0113/4 X 12s GREEN JUMPER HOSE PUMPFLEX (2) �IVER5IFIED IOD-3ENTRY GOTS o
<br /> (I2) THERMOID 2246-B484-3013/411 3/4" x v GREEN HOSE MXMS PUMPFLEX (2-1, DIVERSIFIED 8 D-2 T ENTRY BOOTS h Q
<br /> (30) DIVERSIFIED 4D-1.1 ENTRY BOOTS
<br /> (12)DIVERSIFIED ST-103 SEALTITE D:5T 10.3 CASES
<br /> PET= 1
<br /> OF SHEET5