My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: PIOUS PETROLEUM 713 N.EL DORADO STOCKTON CA 95202 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a y <br /> professional opinion only and are solely for informational purposes. Drawing not to .C STORE <br /> scale. <br /> . 12 . 11 . . . . . . . . . . 6 .5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . E-STOP. . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> x x <br /> . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR Sensor <br /> 10 . . . . .9. . . . . . 4 . . . . . .3. . . . . . . . F=FILLS <br /> V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> x , . . x . . . . . . . . . . . . . . . . . . . . . . L=Turbine/Leak Detector <br /> . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B=Brine Sensor <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S=Smart Sensor <br /> 8. . . . . .7. . . . . . .2. . . . 1. . . . . . . . . . . . . . . . . . . . . C=Floats&Chains <br /> . . . . . . . . . . . . . . . . . . . . I . . . . . . E=EStop <br /> X . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . x . . . . . . . . . . . . . . . . . . . . . . . *PIPING <br /> (ARROWS) <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing of <br /> . piping exit of <br /> sump and UDC's. <br /> . . . . . . . . . . . . . No underground <br /> 0 L 0 0 L O 0 . drawing is <br /> . . . . . . . . . . . . . . . <br /> cnasnce . . . . accurate,we <br /> ` x . . . . . . . . . . . cannot speculate <br /> blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> OD 0 . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . .vents . . <br /> C) <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . = . . . . <br /> Date map was drawn: 6/1118 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.