My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED UST OPERATOR MONTHLY INSPECTION REPORT <br /> Facility Name: National Petroleum Inspection Date: <br /> Facility Address: 713 N EI Dorado St City: Stockton <br /> Name of Designated UST Operator Conducting Inspection: Niken Patel <br /> International Code Council Certification No.: 5243194-UC Expiration Date: 3/26/2017 <br /> Signature: Phone: (510)677-4467 ext. <br /> NIA m Not Applicable <br /> F2. <br /> MONITORING PANEL/ALARM HISTORY Yes No N/A <br /> Is the monitorin s stem owered on and in ro er o eratin mode? F1 D ELIs the monitorin s stem not current) showin an leak alarms? ❑Is the Alarm History Report/log for the previous month available,and has it been reviewed by the <br /> Designated UST O erat-9 (Attach a co o the alarm history report1log to this ins ectiort orm.) <br /> 4. 1 Has each alarm for the revious month been res onded to a ro riatel ? El <br /> UST SYSTEM INSPECTION <br /> 5. Are tank-top containment sumps free of water,debris,and hazardous substance? Note:If the annver to Item 4 was"Yes,-skip <br /> to Item 6. Sumps where an alarm has occurred in the past month must be inspected if a qualified service technician has not responded to,and <br /> properly addressed,the cause o the alarm.Documentation verifying appropriate service should be attached to this report. <br /> Yes No YCs No :4.` <br /> Sump Location: / Sump Location: (?,; <br /> Sump Location: EA I..El 0 Sump Location: Rti',J <br /> 6. Ares ill buckets(containment structures)free of water,debris,and hazardous substance? <br /> Yes No N/AI Yes I No I N/A <br /> Tank I ID– Tank 4 ID– <br /> Tank 2 ID– Tank 5 ID– <br /> Tank 3 ID– Tank 6 ID– Li I Li I I <br /> 7. Are under-dispenser containment areas free of water,debris,and hazardous substance? <br /> Yes I No N/A I Yes No N/A <br /> Dispenser– 1/2 Dispenser–9/10 <br /> Dispenser–3/4 + Dispenser– 11/12 <br /> Dispenser–5/6 El Ej Dispenser– 13/14 1:1 El <br /> Dispenser–7/8 Dispenser– 15/16 01 ' <br /> 8. Leak detection is properly located within under-dispenser containment. <br /> Yes I No I N/A Yes I No I N/A <br /> Dispenser– 1/2 Dispenser–9/10 <br /> Dispenser–3/4 0. Dispenser– 11/12 <br /> Dispenser–5/6 M. Dis enser– 13/14 L <br /> Dispenser–7/8 0 Ej El Dis enser– 15/16 <br /> PAPERWORK INSPECTION Yes No N/A Date D ne <br /> 9. Monito ing System Certification was completed within the past 12 months? ' S <br /> 10. Line Leak Detectors were tested/certified within the past 12 months? I <br /> 11. Spill bucket(containment structure)testing completed within the past 12 months? i <br /> 12. Line ti htness testing completed within the required time frame? <br /> 13. Secondary containment tests completed within the required time frame? 17f' <br /> 14. Enhanced Leak Detection completed within the required time frame? <br /> 15. Other re uired testis maintenance was completed within required time frame? List test/maintenance items below.) <br /> Describe Test/Maintenance: I Li Li <br /> Describe Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Yps No N/A <br /> 16. Have all facility employees received the required on-the-job mining within the past ear? Ll I El I El <br /> 17. Have all facility employees hired within the past 30 days received the required on-the-job train in .? <br /> Note: Explain any"No"answers in the"Comments"section on the following pate.Those issues require corrective action from <br /> the UST owner/operator. -- <br /> UN-057-1/2 www.unidoes.org LW 6.6.. 9/26/05 <br /> JUN 0 2 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.