Laserfiche WebLink
SWRCB,January 2002 ' LLL'**a o�` <br /> Secondary Containment Testing Report Form MAY 31 2016 <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systemsA-* � <br /> appropriate pages of this form to report results for all components tested. The completed form, written test�p}oce dwres; xr,�-- - <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: National Petroleum Date of Testing: May 11,2016 <br /> Facility Address: 713 North Eldorado Street,Stockton,Ca.95202 <br /> Facility Contact: Nick or John I Phone: (209)235-6262 <br /> Date Local Agency Was Notified of Testing: 4/20/2016,by Afford-A-Test <br /> Name of Local Agency Inspector(if present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: R&D Compliance Testing <br /> Technician Conducting Test: Benjamin F.Duncan Jr. <br /> Credentials: ❑CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br /> License Type: Tank Tester License Number:90-1120/ICC#5246802-UT <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> Caldwell Systems Piping Sumps/Fill Riser Sumps/Vent Sum /UDC's July 31, 2017 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Secondary Pipe#1 X ❑ ❑ ❑ Dispenser Sump#3&4 X ❑ ❑ ❑ <br /> Secondary Pipe#2 X ❑ ❑ ❑ Dispenser Sump#5&6 X ❑ ❑ ❑ <br /> Secondary Pipe#3 X ❑ ❑ ❑ Dispenser Sump#7&8 X ❑ ❑ ❑ <br /> Secondary Pipe#4 X ❑ ❑ ❑ Dispenser Sump#9&10 X ❑ ❑ I ❑ <br /> Secondary Pipe#5 X ❑ ❑ ❑ Dispenser Sump#11&12 X ❑ ❑ ❑ <br /> Secondary Pipe#6 X ❑ ❑ ❑ Fill Riser Sump#1 X ❑ ❑ ❑ <br /> Secondary Pipe#7 X ❑ ❑ ❑ Ffill Riser Sump#2 X ❑ ❑ ❑ <br /> Piping Sump#1 X ❑ ❑ ❑ Fill Riser Sump#3 X ❑ ❑ ❑ <br /> Piping Sump#2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#3 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Vent Box Sump X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump #1&2 X I ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Test Fluid Supplied and recovered for reuse by,R&D Compliance Testing. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature:✓Oer� �� May 11,2016 <br />