My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 MAY 31 2016 Page of <br /> 10. FILL RISER CONTAINMENT SUMP,T <br /> Facility is Not Equipped With Fill Riser Containment Sums Li t ILI• <br /> Fill Riser Containment Sumps are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer Ll Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Fill Sump# 1 Fill Sump#2 Fill Sump#3 Fill Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 65" 70" 62 ''/2" <br /> Height from Tank Top to Top of No Piping No Piping No Piping <br /> Highest Piping Penetration: Penetrations Penetrations Penetrations <br /> Height from Tank Top to Lowest 22" 21" 18" <br /> Electrical Penetration: <br /> Condition of sump prior to Dry Dry Dry <br /> testing: <br /> Portion of Sump Tested Water Level 24" Water Level 23" Water Level 20" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test: <br /> Test Start Time: 8:30 8:35 8:40 <br /> Initial Reading(Ri): .001 .001 .001 <br /> Test End Time: 9:00 9:05 9:10 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Is there a sensor in the sump? Yes Yes Yes <br /> Does the sensor alarm when <br /> either product or water is Yes Yes Yes <br /> detected? <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> All three Fill Riser Sumps had a small amount of water present when I arrived,and the Sump Sensors were in alarm, <br /> L 8-Unleaded Fill Box,L 11,Premium Fill Box,and L 13-Diesel Fill Box. <br /> Sensor alarms cleared on L 8 and L 11,but L 13 Sensor would no clear. <br /> Recommend Sensor wiring at junction box in Diesel Fill Sump be checked prior to replacing L 13 Sensor. <br /> Small amount of water in all three Fill Sumps was recovered after testing,for reuse by R&D Compliance Testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.