Laserfiche WebLink
qLL;tJV'Et1) <br /> �(n�1 UST Monitoring Site Plan <br /> Site RdVdre®5 2015 NATIONAL PETROLEUM 713 N.EL DORADO STOCKTON CA 95202 <br /> I-ICAITu IICDADTAA;=KIT. <br /> C STORE <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 12 . 11 6 . .5. <br /> . E-STOP. . <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> 10 9 4 . . . . . .3. <br /> . . . . . . . . . . A-=ANNULAR <br /> F=FILL <br /> V=VAPOR <br /> . . . . . . . . . . . . . . . . . . P--PROBE <br /> . . . . . . . . T=TURBINE <br /> 8 7 2. 1. . . . . . . . . . . X=SENSOR <br /> s <br /> z <br /> . . . . . . . . . . . . . . . . . . . <br /> 0❑ O ex O 0 A � � c:uti�ncr:X X . . . . . . . . . . . <br /> OJ <br /> X . . . . . . . . . . . . . . . O O Pments . . . . . <br /> . . <br /> . <br /> Date map was drawn: 4127/11 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />