Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: PIOUS PETROLEUM 713 N.EL DORADO STOCKTON CA 95202 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a a <br /> professional opinion only and are solely for informational purposes. Drawing not to .C STORE <br /> scale. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . 12 . 11 . . . . . . . . . . 6 .5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . E-STOP. . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR Sensor <br /> . . 10 . . . . .9. . . . . 4 . .3. . . . . F=FILLS <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V=VAPOR <br /> P=PROBE <br /> X , . , X _ . . . . . . . . . . . L=Turbine/Leak Detector <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B=Brine Sensor <br /> . . . . . . . . . . . . . . . . . . S=Smart Sensor <br /> 8. .7. 2. 1. . . . C=Floats&Chains <br /> . . . . . . . . E=E Stop <br /> x . . . . . . . . . . . . . . . . . . . . . . <br /> X <br /> . . *PIPING <br /> (ARROWS) <br /> . . . . . . . . . . . . . . . . . . . . . . . Drawing of <br /> "7 <br /> . . piping exit of <br /> . . . . . . . . . . . . . . . sump and UDC's. <br /> No underground <br /> 0 L0 0 L 0 VO . . . . . . . . . . . . . . . . . . . drawing is <br /> GARBAGE accurate,we <br /> " �. v . . . . . cannot speculate <br /> . . . . . . <br /> blue prints. <br /> LQO 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . .O O O.vents . . . <br /> . . . . . . . . . . . . . . . O <br /> X <br /> Date map was drawn: 5/1/18 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />