My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 '07/2010 THU 8: 52 FAX 2094683433 SJC EHD 0003/006 <br /> JNIFIEID PROGRAM CONSOLIDATED FOE <br /> UNDERGROUND STORAGE TANK _ <br /> MONITORING PLAN- P e 1 of 2 <br /> 011. <br /> 490-1 <br /> TYPE OF ACTION ice'.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> 490-2 <br /> PLAN TYPE yETI_MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I: FACILITY INFORMATION <br /> FACILITY ID N(Agency Use Only) <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> BUSINESS SITE ADDRESS �CITY <br /> _:.. ... II:EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc-)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be perforated by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> 490-30 <br /> MONITORING EQUIPMENT IS SERVICED J311.ANNUALLY ❑ 99-OTHER(Specify): 490.3b <br /> - <br /> M.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. D L SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)42".' :'.'.4 <br /> IV:TANK MONITORING IS PERFORMED USING THE FOLLOWING METHODN: <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (73 CCR 11632,2634) <br /> SECONDARY CONTAINMENT IS: Ela.DRY b.LIQUID FILLED ❑ c.PRESSURIZED El d.UNDER VACUUM °� <br /> PANEL MANUFACTURER: �^ �/�,� Roo; °90.7" I MODEL N: L S j sp 490-8 <br /> LEAK SENSOR MANUFACTURER: 2Pi ,/ Y 4900. MODEL N(S): 79 Z 490-10$S' <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL T NK(SL(23 CCR§2643) 490'11 <br /> PANEL MANUFACTURER: 49011. MODEL N: °9013 <br /> IN-TANK PROBE MANUFACTURER: 490.14 MODEL N(S): -- 49x15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490'16 <br /> [] d.MONTHLY Q e.OTHER(Spec!f')�_-- <br /> ---.-._----_----------------------------__._.--_-----•------•-- 490-16 <br /> PROGRAMMED TESTS. ❑ a.&I g.p.h. ❑ b.0.2 g.p.h_ ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION CZ3 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: [Ia.36 HOURS [3b.60 HOURS 4Wu <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> 490-1A <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490-26 <br /> [199,OTHER(Specify): __ 49027 <br /> V.PIPE MONITORING IS.PERFOIUWED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-25 <br /> VISUAL ALARMS..(13 CCR§26M) <br /> -29 <br /> SECONDARY CONTAINMENT IS: a.DRY [3b.LIQUID FILLED _❑a PRESSURIZED ❑d.UNDFR VACUUM _ - 490- <br /> PANEL MANUFACTURER: x" 490.3° MODEL M TLS S D 49031 <br /> 31 <br /> 3S� ._z�f <br /> LEAK SENSOR MANUFACTURER: �,/ vJ 490-32 MODEL H(S): 13 y - <br /> 490.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e_,TURBINE)SHUTDOWN. 9a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ba.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED CCR 49036 <br /> MLLD MANUFACTURER(S): <br /> 490-37 MODEL S}: r)'g - qS'0 �O/ 49036 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TESTS (23 CCR§2636) 49039 <br /> ELLD MANUFACTURERS) vh/ A�CC) 41, MODEL N(S). -� 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g_ph_ ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b_NO 49044 <br /> 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS i 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a DAILY ❑ b.WEEKLY ❑c.MRN.MONTHLY&EACH TIME SYSTEM OPERATED' 490.49 <br /> •Nlo++edfor mad ofunbwicd Cud ip HSC 2525(. 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(ax3)1. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490•S2 <br /> ❑ 99.OTHER(Specify) 49053 <br /> rtr�R ttRT.11 tt2/2007t 1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.