My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f i SWRCB,January 2006' <br /> Spill Bucket Testing Report Form <br /> Thisfor m is intended for use by contractors performing annual testing UST spill containment sir tures. The completed.form and <br /> printouts from tests (if applicable), should be provided to the facility ow er/operator for submittal t the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: SKYMART VALERO Date ofTestin 4-28-2010 <br /> Facility Address: 713 N ELDORADO STREET STOCKTO C A <br /> Facility Contact: ALI Phone: <br /> Date Local Agency Was Notified of Testing: <br /> -- <br /> Name of Local Agency Inspector(if present during testing): ARIS <br /> 2. TESTING CONTRACTOR INFORMATION _ <br /> Company Name: AFFORDA TEST 416 2"d Street Galt, CA 95632 (209)'744-0112 Fax:(209)744-0116— <br /> Technician Conducting Test: ❑ Lyle D.Nimmo ❑ Zane A,N mmo ® David A. Winkl r ❑ Felix G. Ramirez <br /> 5249115-UT 5263322 UT 5263373-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTIWG INFORMATION <br /> Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used: h20 and tape measure Equipment Resolution: 1/16 <br /> Identify Spill Bucket (By Tank 1 87 2 91 3 DSL 4 1 <br /> Number, Stored Product, etc. -- <br /> ❑ Direct BuDirect Bury <br /> [:1 Direct Bury ❑ Direct Bary ® Containedin El Contained in <br /> Bucket Installation Type: ® Contained in Sump ® Contained in SumpSum Sum <br /> Bucket Diameter: 1 1 11 11 <br /> Bucket Depth: 15 14 17 <br /> Wait time between applying - <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): <br /> 930 930 930 <br /> Initial Reading(Ri): 14 12.50 16 <br /> 1030 1030 <br /> Test End Time(TF): 1030 ------ <br /> Final Reading(RF): 14 12.50 16 <br /> IHR IHR <br /> Test Duration(TF—T,): IHR --- <br /> Change in Reading(RF-Rj): 0 0 10 <br /> Pass/Fail Threshold or 1/16 1/16 1/16 <br /> Criteria. <br /> Test Result: ® Pass Fail ® Pass ❑ Fail ® Pass ❑ Fail E01 Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, ind recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCT15IG THIS TESTING <br /> hereby certify that all the information contained in this report is true,accurate,a nd in full compliance with legal requirements. <br /> Technician's Signature: TC-)--j Date 4-28-2010 <br /> State laws and regulations do not currently require testing to be perf rmed by a qualified contractor. However, local requirements <br /> may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.