My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:14:59 AM
Creation date
3/25/2020 4:23:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> SAN JOA I QUAWUNTY ENVIRONMENTAL HEALTH AWARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mot. <br /> 1 PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Moz. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - <br /> M03. <br /> FACILITY NAME <br /> FACILITY SITE ADDRESS 7 M04. _ MOS. <br /> U ST <br /> U. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in Mob <br /> m <br /> accordance with the equipment manufacturers'instructions,or annuall whichever is more frequent. Such work must be performed by qualified personnel. <br /> M07. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> M�O ITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> L✓J ►.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNU (INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY [ff b.LIQUID FILLED ❑ c.UNDER PRESSURE _ UNDER VACUUM <br /> M11. <br /> PANEL MANUFACTURER: l4.2 C 0 M12. MODEL#: f .�.3"j-a M13. <br /> LEAK SENSOR MANUFACTURER: _ R A 4 4� M14 MODEL#(S): 3 �0 ?,[Uj MIs' <br /> 9'2.AUTOMATIC TANK GAUGING(AT SYSTEM USED TO MONITOR SINGLE WALL TAM 6(S) MODEL#: / G S �� M17. <br /> PANEL MANUFACTURER: + l lLcU <br /> M19. <br /> IN-TANK PROBE MANUFACTURER: ERGO MIB. MODEL#(S): <br /> Mzo. <br /> LEAK TEST FREQUENCY: [q'a.CONTINUOUS [Ib.DAILY/NIGHTLY ❑ c.WEEKLY <br /> M21. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> J M22. M23. <br /> PROGRAMMED TESTS: 11a.0.1 g.p.h. E b.0.2 g.p.h. Elc.OTHER(Specify): <br /> INVENTORY RECONCILIATION C1a.MANUAL PER 23 CCR§2646 Elb.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: F1 a.36 HOURS ❑ <br /> b.60 HOURS Mzs. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26. M27. <br /> TEST FREQUENCY: ❑ aa.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> VISUAL MONITORING DONE: DAILY ❑ b.WEEKLY(Requires agency approval) <br /> MzB. <br /> ❑ <br /> 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> M30. <br /> 7TORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT M31 <br /> SECONDARY CONTAINMENT IS: a.DRY C] b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: <br /> U(� M32. MODEL#: L {ti S 3 5 M33. <br /> ��v M34. MODEL#(S): 17 G( 3 $ - Q M35 <br /> LEAK SENSOR MANUFACTURER: -� <br /> M36. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? �a.YES ❑ b.NO <br /> M37. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED M39 <br /> MLLD MANUFACTURER(s): M38. MODEL#(S): <br /> 2/3.ELECTRONIC LINE LEAK DETEC OR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> M41. <br /> ELLD MANUFACTURER:_V1_68 t'ki ' 1 T M40. MODEL#: <br /> M42. <br /> PROGRAMMED LINE INTEGRITY TESTS: [Ia.MINIMUM MONTHLY 0.2 g.p.h. [Ib.MINIMUM ANNUAL 0.1 g.p.h. <br /> M43. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? YES ❑ b.NO <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN. <br /> YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> M45. M46. <br /> TEST FREQUENCY: Ela.ANNUALLY El b.EVERY 3 YEARS El c.OTHER(Specify) <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> *Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(6x3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) Mas <br /> ❑ <br /> 99.OTHER(Specify) <br /> 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.