My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:14:59 AM
Creation date
3/25/2020 4:23:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> Software Version Installed: _ <br /> Com lete the following Checklist: <br /> El Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ NO Were all sensors visually inspected,ftinctionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that otlequipment will <br /> not interfere with their proper operation? <br /> -5--yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ® N/A operational? <br /> l Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that applti) ® Sump/Trench Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes; ❑No. <br /> ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> II ® N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what.percent of tank capacity does the alarm trigger? <br /> % <br /> a Yes* ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ,21 Y,%,�* LlNo Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ®Product; ® Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if appticable <br /> 3F 1'esI ❑ No* Is all monitoring a ui mentoperational per manufacturer's specifications? <br /> h In Section E below,describe how and when these deficiencies were or will be corrected.j <br /> E. Comments: G �f G fl oo V %'V-1 q1 fl' h Sung <br /> G1 c,rvtouh� d t�r��lC �- �u►�CA_ �w� h�lS �a Q�� Use <br /> Pa,,z 2 ol'3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.