Laserfiche WebLink
ulanitoPing System Certification <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ® No* Has all input wiring been inspected for proper entry and terminat' , ' eluding testing for ground faults? <br /> ❑ Yes ® No* Were all tank gauging probes visually inspected for damage "sueuildup? <br /> ❑ Yes ® No* Was accuracy of system product level readings tested? �fz <br /> ❑ Yes ® No* Was accuracy of system water level readings tested? <br /> ❑ Yes ® No* Were all probes reinstalled properly? zz <br /> ❑ Yes ® No* Were all items on the equipment manufactures ainten a checklist co t ? <br /> * In the Section H,below,describe how and when these def i es w e or will be cor eGfe <br /> G. Line Leak Detectors (LLD): ❑ Check tx LLDs are not ins ed. <br /> Complete the following checklist: <br /> ® Yes ❑ No* For equipment start-up or eqtriipment certificat�5, eak simur <br /> to rift' LD performance? <br /> ❑ N/A (Check all that apply) Si u e ate: ® 3 g.p.h. p.h ; ❑ 0.2 <br /> ❑ Yes ® No* Were all LLDs confi me era 'o 1 and accurate wi latory req s? <br /> ® Yes ❑ No* Was the testing ap y calibrated? <br /> ❑ Yes ❑ No* For mechanical LDs, oe e LLD ret pod ow if it det ak? <br /> ® N/A <br /> ® Yes ❑ No* For elec oyr'i L oes the turb' a au m ' Ily shut o tects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No* Fo tr is Ds, does the in utomatically ut ff t y portion of the monitoring system is disabled <br /> El N/A r ' co ect d? <br /> ® Yes ❑ No* r el nic LLDs,doe rb' a automaticall shut ' any portion of the monitoring system malfunctions <br /> ❑ or fail test? <br /> ® Yes * or electronic LLD e a accessible i ' g o e ions been visually inspected? <br /> C:] <br /> /A <br /> _ZYes No* Were all items on a uipment m ac a 's maintenance checklist completed? <br /> x In the Section H,below i ow and when a ic' ncies were or will be corrected. <br /> H. Comments: Diesel LL-11—i, d. VV_ -pie days to perge all the air pi it and then NA.101 return to test @gain. <br /> 5/3/07- Adjusted f inctinnal PIPmPnt at diPsPl STP and retPsetct PI I I) nnPratinn PI I D PASSED <br /> Page 3 of 3 <br />