My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
22754
>
2900 - Site Mitigation Program
>
PR0537973
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 3:17:27 PM
Creation date
3/26/2020 3:05:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537973
PE
2950
FACILITY_ID
FA0021921
FACILITY_NAME
WILLIAMS TANKER SPILL
STREET_NUMBER
22754
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
ROW
CURRENT_STATUS
01
SITE_LOCATION
22754 E MARIPOSA RD
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENCROACHMENT PERMIT GENERAL PROVISIONS <br /> 13-1 <br /> I. This permit is issued under and subject to aI1 Iaws and ordinances of agencies governing the encroachment herein permitted.See the <br /> following references: <br /> STREETS AND HIGHWAYS CODE <br /> 1.Division 1,Chapter 3 <br /> 2.Division 2,Chapter 2,Section 942'- <br /> 3. <br /> 42-3.Division 2,Chapter 4,Section 1126 <br /> 4.Division 2,Chapter 5.5 and Chapter 6 <br /> SAN JOAQUIN COUNTY ORDINANCES NUMBERED:324,441,648,662,672,695,700,860,892,3359,and 3675. <br /> '2. It is understood and agreed by the Permittee that the performance of any work under this permit shall constitute an acceptance of all the <br /> provisions contained herein and failure on the Pernitteds part to comply with any provision will be cause for revocation of this permit. <br /> Except as otherwise provided for public agencies and franchise holders,this pennit is revocable on five days notice. <br /> 3. All work shall be done subject to tine supervision of and the satisfaction of the grantor. The Permittee shall at all times during the progress <br /> of the work keep time County Highway in as neat and clean condition as is possible and upon completion of the work authorized herein, <br /> shall leave the County Highway in a thoroughly neat,clean and usable condition. <br /> 4. The Permittee also agrees by the acceptance of this permit to properly maintain any encroachment structure placed by the Permittee on any <br /> part of the County Highway and to immediately repair any damage to any portion of the highway,which occurs as a result of the <br /> maintenance of the said encroachment structure,until such time as the Permittee may be relieved of time responsibility for such maintenance <br /> by the County of Sail Joaquin. <br /> 5. The Permittee also agrees by the acceptance of this permit to make,at its own expense,such repairs as may be deemed necessary by time <br /> County Department of Public Works. <br /> 6. It is further agreed by the Permittee that whenever construction,reconstruction or maintenance work upon the highway is necessary,the <br /> installation provided for herein shall,upon request of the County Department of Public Works,be immediately moved or removed by and <br /> at the sole expense of the Permittee. <br /> 7. No material used for fill or backfill in the construction of the encroachment shall be borrowed or taken from within the County right of <br /> way. <br /> 8. All work shall be planned and carried out with as little inconvenience as possible to the traveling public.-No material shall be stacked <br /> within eight feet(8)of the edge of the pavement or traveled way unless otherwise provided herein. Adequate provision shall be made for <br /> time protection of the traveling public. Traffic control standards shall be utilized including barricades;approved signs and lights;and <br /> flagmen,as required by time particular work in progress. <br /> 9. The Permittee,by the acceptance of this permit,shall assume full responsibility for all liability for personal injury or damage to property <br /> which may arise out of the work herein permitted or which may arise out of the failure of the part of the Permittee to properly perform the <br /> work provided under this permit. In the event any claim of such liability is made against the County of San Joaquin or any department, <br /> official or employee thereof,the Permittee shall defend,indenumify,and hold each of them harmless for such claim. <br /> 10. All backfill material is to be moistened as necessary and thoroughly compacted with mechanical means.If required by the County Director <br /> of Public Works,such backfill shall consist of gravel or crashed rock.The Permittee shall maintain the surface over structures placed <br /> hereunder as may be necessary to insure the return of time roadway to a completely*stable condition and until relieved of such responsibility <br /> by the County Department.of Public Works.Wherever a gravel,crushed rock or asphalt surface is removed or damaged in time course of. <br /> work related to the permitted encroachment,such material shall either be separately stored and replaced in the roadway as nearly as <br /> possible in its original state or shall be replaced in kind,and the roadway shall be left in at least as good a condition as it was before the <br /> commencement of operations of placing the encroachment structure. <br /> 11. Whenever it becomes necessary to secure permission from abutting property owners for the proposed work,such authority must be secured <br /> by the Permittee prior to starting work. <br /> 12. The current and future safety and convenience of the traveling public shall be given every consideration in the location and methods of <br /> construction utilized. <br /> 13. The Permittee is responsible for the preservation of survey monuments within the work herein permitted.If any are disturbed,the Permittee <br /> is required to tie out each location and re-establish them after completion of work,using a licensed land surveyor.A comer record must be <br /> filed in accordance with state law for any re-set monuments. <br /> PAPEPMTS COUNTER',meral proNisionslGencml Provisions 2013.do,c <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.