My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARSHALL
>
1752
>
2900 - Site Mitigation Program
>
PR0516494
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 4:33:55 PM
Creation date
3/26/2020 4:31:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516494
PE
2950
FACILITY_ID
FA0012642
FACILITY_NAME
FANNIE MAE
STREET_NUMBER
1752
STREET_NAME
MARSHALL
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
12721206
CURRENT_STATUS
01
SITE_LOCATION
1752 MARSHALL AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Central Valley Realty-Marshall <br /> Job Location: 1752 Marshall Avenue, Stockton, California <br /> Client Name: Central Valley Realty <br /> Project Number: 395 Date: September 1, 2000 <br /> General Work Description: Advance one boring to approximately 30 feet bgs adjacent to or <br /> beneath the existing pit, and four shallow borings to approximately 5 feet bgs adjacent to or beneath <br /> the leachfield to investigate VOCs in soil. <br /> SSP Prepared by: John Lane <br /> On-site Safety Officer: Sean Garvey <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. General safe work practices are <br /> identified in the GZA Injury and Illness Prevention Manual and apply to all GZA work sites. <br /> The provisions set-forth in this SSP shall apply to Ground Zero Analysis, Inc. (GZA) employees <br /> and any subcontractors working for GZA at the job site. All personnel working for GZA at the job <br /> site must read this SSP, and sign the attached Compliance Agreement before entering the work <br /> area. Field personnel may deviate from the safety provisions set-forth in this SSP, but only to <br /> upgrade or increase the safety requirements. GZA personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures, appropriate amendments to this SSP will be provided by the GZA project manager or <br /> supervisor, with the written approval of a GZA branch safety officer or the GZA Health and Safety <br /> Director. <br /> PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.