Laserfiche WebLink
11. Please include a copy of any studies (soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: <br /> b. Sewage Disposal: L <br /> C . Storm Drainage: -c <br /> If an extension .of any of the above is necessary, indicate <br /> which service(s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : <br /> d. Natural Gas: <br /> e. Electricity: >� <br /> f .- Road/Access ( i .e . , paved, unpaved, public private, road name ) : <br /> �,P-,rte -aa�t�. �►cr �S J�� �o��s - Sr JaE,�� <br /> g . Fire: Distance to nearest fire station: <br /> h. Schools: <br /> 2 . Describe,�.Any..- sitq.aJterations which result from the proposed.pro- <br /> je,ct (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterativ:-.s to drainages, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> �t,.�e� �►•tA.t.>��s 'prate $+Jtc�D�t`1�'�At� Gc�c�-ra.�a►t ��.Y. <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Types of emissions and sources associated with project <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project Fy--,C .tta,L ti rD `7'yP1cAt_ ar <br /> ' !�A M t L� NflMF1S <br /> Will the project result, in substantial air emissions or deteriora- <br /> tion of ambient air quality? NO YES j <br /> 4 . How much agricultural land will ' be removed from ?production? <br /> Irrigated ✓ Not irrigated , <br /> Minor Subdivision - 9 - ( 6/86 ) <br />