Laserfiche WebLink
Mr. Jeff Baker - 5 - <br /> Stockton Terminals Technicaamittee • 15 December 2008 <br /> Use of the corrected elevation data in future QMRs should result in the production of <br /> groundwater elevation maps that are more representative of actual conditions. <br /> In summary, (1) by 15 December 2008, submit a well installation report and (2) by <br /> 27 January 2009 submit the TS/MW-3D pilot study work plan and the revised <br /> contingency plan with historical TBA mean concentrations for PS/MW-18 and PS/WC- <br /> 1M calculated in accordance with the method discussed in the 10 December meeting. <br /> If you have any questions regarding this letter, you may contact me at (916) 464-4811 <br /> or by email at betaylor@waterboards.ca.gov. <br /> BRIAN TAYLOR, .G. <br /> Engineering Geologist <br /> cc: Ms. Margaret Lagorio, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Mr. Jeffrey Wingfield, Port of Stockton <br /> Mr. Mark Chandler, Time Oil Company, Seattle, WA <br /> Mr. Don Pratt, BP, San Ramon <br /> Mr. Gary Haeck, Stantec Consulting Corporation., Rancho Cordova <br /> Mr. Mark O'Brien, Environmental Risk Services Corporation, Alamo <br /> Mr. Jeremy Hughes, LFR Inc., Granite Bay <br /> Mr. Jerry Stauffer, Valero LP, San Antonio, TX <br /> Ms. Amanda Spencer, Ash Creek Associates, Portland, OR <br />