My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR vwvvv.secorcom <br /> INTERNATIONAL 3017 Kilgore Road,Suite 100 <br /> S E C O R INCORPORATED Rancho Cordova,CA 95670 <br /> 916-661-0400 TEL <br /> 916-861-0430 FM <br /> May 16, 2008 <br /> Mr. Brian Taylor <br /> California Regional Water Quality Control Board — Central Valley Region <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, California 95670 <br /> RE: Work Plan for Additional Monitoring Well Installation <br /> Stockton Terminals Technical Committee Facilities <br /> Port of Stockton <br /> Stockton, California <br /> SECOR Project No. 770T.43673.14.0002 <br /> Dear Mr. Taylor: <br /> Enclosed please find the above-cited work plan prepared by SECOR International <br /> Incorporated. This work plan has been prepared in response to the California Regional <br /> Water Quality Control Board's (RWQCB) April 25, 2008 letter. The RWQCB letter also <br /> requested STTC provide documentation of the contingency plan. The contingency plan <br /> was outlined in SECOR's Response to RWQCB Letter Dated May 9, 2003 and Addendum <br /> to Corrective Action Plan Dated April 30, 2003 (CAP Addendum). The CAP Addendum was <br /> approved by the RWQCB in a letter dated April 8, 2003 and entitled Approval of Corrective <br /> Action Plan, Stockton Terminals Technical Committee, Port of Stockton, San Joaquin Co. <br /> The contingency plan is outlined on Page 9 of the CAP Addendum, a copy of the CAP <br /> Addendum is provided as Attachment 3 of this work plan. <br /> Should you have any questions please feel free to contact the undersigned at (916) 861- <br /> 0400, extension 233. <br /> Sincerely, <br /> SECTOR'IInternational Incorporated <br /> �4 <br /> Todd Brown, P. G. <br /> Senior Geologist <br /> I:\STTC-Stockton%Work PlansWdditional Well Install WP 2008.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.