My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • 'IT Corporation <br /> 1433 North Alarket Boulevard <br /> H <br /> Sacramento, CA 95834-1943 <br /> Tel. 916.928.3300 <br /> Fax.916.928.3341 <br /> the [y� '; A Member of The IT Group <br /> w1gro <br /> February 23, 2001 <br /> Project 812717 <br /> Mr. Phil Isorena <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3003 <br /> Subject: Request for Extension for the Completion of the Feasibility Study for the <br /> Port of Stockton Terminals <br /> Stockton Terminals Technical Committee Facilities <br /> Port of Stockton, Stockton, California <br /> Dear Mr. Isorena: <br /> On behalf of Stockton Terminals Technical Committee(STTC), IT Corporation(IT)requests an <br /> extension for the submittal of the feasibility study for the Port of Stockton terminal facilities. I <br /> met with the STTC members on February 20, 2001, at Tesoro's office in Seattle,Washington, to <br /> review the results of the recently completed groundwater investigation and to develop a <br /> conceptual model for the feasibility study. <br /> As you will recall, the report was delayed because of the failure of our laboratory to provide the <br /> analytical results on time. We also experienced an additional delay in collecting all of the <br /> environmental documents prepared for this site. Several transitions have occurred between <br /> consultants over the past couple of years and some of the documents were misplaced. We have <br /> conducted an intensive search and have recovered of key information and documents from offsite <br /> storage. <br /> The number of days required to complete several of the tasks have been increased following our <br /> preliminary review of the vast amount of historical data that exists on this site. Most of this data <br /> is not available electronically and most of the figures and drawings are hand drafted. Based on <br /> the unforeseen data compilation issues, I have attached a revised project schedule with May 4, <br /> 2001 as the due date for the feasibility study. <br /> The revised schedule also includes ten additional days for the STTC members to complete their <br /> review of the draft feasibility study. <br />
The URL can be used to link to this page
Your browser does not support the video tag.