My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELL DETAILS <br /> PROJECT NUMBER OC42-001.023 BORING/WELL NO. PS/WC-2M <br /> PROJECT NAME STTC - Port of Stockton TOP OF CASING ELEV. <br /> LOCATION Stockton CA GROUND SURFACE ELEV. <br /> WELL PERMIT NO. 2001 DATUM <br /> INSTALLATION DATE May 17 1995 <br /> EXPLORATORY BORING <br /> c TOC (Top of casing) <br /> a. Total depth 35 ft <br /> b. Upper boring depth 19 ft <br /> c. Upper boring diameter 12.7 in. <br /> G-5 vault box (Std.) d. Lower boring diameter 8 in. <br /> Drilling method Hollow Stem Auger <br /> n CONDUCTOR CASING <br /> e. Casing length 19.7 ft. <br /> Material_ 10 guage mild steel <br /> f f. Diameter 8.7 in. <br /> g. Upper(outer) seal 19 ft. <br /> e b k g i I o Material neat cement <br /> h. Penetration 12 in <br /> i. Depth 20 tt <br /> WELL CONSTRUCTION <br /> j. Total casing length 34.7 ft. <br /> a j h Material Schedule 40 PVC <br /> k. Diameter 2 in. <br /> I. Depth to top perforations 30.1 ft. <br /> m. Perforated length 4.5 ft. <br /> p Perforated interval from 30.1 to 34.6 ft. <br /> Perforation type <br /> factory slot <br /> Perforation size 0.020 inch <br /> n. Surface seal 0.5 ft. <br /> Material concrete <br /> q o. Backfill 26.5 ft. <br /> Material cement with 5% bentonite <br /> m p. Seal 1 ft. <br /> Material 3/4 inch bentonite dell t <br /> q. Gravel pack 6 ft. <br /> -- Gravel pack interval fron-L 35 ft. <br /> r Material #3 Lonestar Sand <br /> ,, r. Bottom seal/fill ft. <br /> Material <br /> Form prepared by <br />
The URL can be used to link to this page
Your browser does not support the video tag.