My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Greg Vaughn Project No. OC42-001.20 <br /> April 11, 1995 <br /> Page 5 <br /> • Dissolved lead using EPA Method 7421 <br /> REPORTING <br /> At the conclusion of the off-site assessment and monitoring well installation program, <br /> EMCON will prepare a report documenting work performed. CPT and boring log data <br /> will be evaluated and added, as appropriate, to existing cross-sections. New cross-sections <br /> will be prepared as needed. CPT profiles, boring logs, and well details will be presented as <br /> Appendices. <br /> Analytical data will be tabulated, evaluated, and plotted on site base maps depicting the <br /> lateral and vertical distribution of petroleum hydrocarbon impacts. Copies of certified <br /> analytical reports and chain-of-custody documentation will be included. <br /> SCHEDULE <br /> A proposed generalized project schedule is attached (see Figure 1). The schedule does not <br /> contain firm dates based on the access issue and unknown time frame for resolution. <br /> If you have any questions regarding the proposed scope of work,please call. <br /> Sincerely, <br /> EMCON <br /> Mark <br /> PP TeBonham, P.E. <br /> Staff Geologist Project Manager <br /> Attachments: Table 1 Additional Assessment Activities <br /> Table 2 Proposed Phase II Well Locations and Current Need <br /> Figure 1 STTC Fuel Distribution Terminal Assessment Schedule <br /> Drawing 1 Site Plan with Proposed Investigation Locations <br /> cc: Mr. Roy Thun, STTC Chairman, ARCO Products Company <br /> Ms. Anastasia Duarte, Time Oil Company <br /> Mr. Kyle Mullins, ST Services <br /> Mr. Robert Donovan, Tesoro Refining Marketing & Supply Company <br /> Mr. Alexander Krygsman, Port Director, Port of Stockton <br /> Ms. Dianne Hinson, San Joaquin County Public Health Department <br /> SACIN�PJMC4Z,DC420012.OES-94VIb:3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.