Laserfiche WebLink
Table 2 <br /> Proposed Phase II Well Locations and Current Need <br /> WELL RWOCB Still Utility <br /> 'Must Install' Needed <br /> Proposed A Zone Wells <br /> 1A Yes No Upgradient A zone,Confirm PS/CPT93-2 <br /> 2A Yes No Confmr edge of A zone plume,similar information from PS/MW-17,PS/MW-19,PS/MW-20 <br /> 3A Yes No Similar information from PS/MW-17A <br /> Proposed B Zone Wells <br /> 1B Yes No Upgradient B zone,Confirm PS/CPT93.2 <br /> 5B Yes Yes Confirm ND line,PSICPT934 and vertical comparision with proposed C and D zone wells <br /> 6B Yes Yes Within B zone impacts BE part of site • <br /> 7B Yes Yes Confirm ND line,PS/CB93-3 <br /> 8B Yes No Confirm ND line,PS/CB93-2 <br /> Other B zone wells wanted by RWOCB <br /> PS/CB93-4 Yes No RWOCB says well needed to confirm HydroPunch,Benzene=2.2 ug/L <br /> install well at 5B,use monitoring results to determine if assessment to north is needed <br /> PS/CPT93-5 Yes No Confirm ND line,PS/CP793-5,suggest alternate location near PS/MW-19 as 6B <br /> Proposed C zone Wells <br /> 1C No Upgradient C zone,Confirm PSICPT93-2 <br /> 5C Yes Confirm PS/CPT93-4,benzene=6.2 ug/L <br /> 6C Yes Confirm impacts at PS/CPT93-3.C zone addition to A-B well pair <br /> 7C No C zone addition to A-B pair,B zone impacted,alternate locations suggested <br /> 8C Yes confirm PS/CB93-1,benzene 3.9 ug/L <br /> 9C no C zone addition to A-B pair,B zone impacted <br /> Other C zone Wells wanted by RWOCB <br /> DG Of PS/CPT93-3 No Downgradient of PS/CPT93-3,confirm results,access issue in COGEN area <br /> Alternate locations adjacent to PS/WC-1 s,m and near PS/MW-20 <br /> Confirmation Wells Additional wells to confirm HydroPunch to be determined after additional assessment <br /> Proposed D zone Walls • <br /> 1D <br /> 2D <br /> 3D Yes Confirm PS/CB93-1,benzene 22 ug/L <br /> Other D zone Wells wanted by RWOCB <br /> DG of PSICPT93.3 No Downgradient of PS/CPT93.3,confirm results,access issue in COGEN area <br /> Alternate locations adjacent to PS/WC-1 s,m and near PS/MW-20 <br /> Confirmation Wells Additional wells to confirm HydroPunch to be determined after additional assessment <br /> well designations refer to proposed well locations on Drawings 4 through 7 of the Phase II Assessment Report(EMCON,September 1994) <br /> dmclexceldat/posf ilestwellx.xls <br />