My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> Proposed Phase II Well Locations and Current Need <br /> WELL RWOCB Still Utility <br /> 'Must Install' Needed <br /> Proposed A Zone Wells <br /> 1A Yes No Upgradient A zone,Confirm PS/CPT93-2 <br /> 2A Yes No Confmr edge of A zone plume,similar information from PS/MW-17,PS/MW-19,PS/MW-20 <br /> 3A Yes No Similar information from PS/MW-17A <br /> Proposed B Zone Wells <br /> 1B Yes No Upgradient B zone,Confirm PS/CPT93.2 <br /> 5B Yes Yes Confirm ND line,PSICPT934 and vertical comparision with proposed C and D zone wells <br /> 6B Yes Yes Within B zone impacts BE part of site • <br /> 7B Yes Yes Confirm ND line,PS/CB93-3 <br /> 8B Yes No Confirm ND line,PS/CB93-2 <br /> Other B zone wells wanted by RWOCB <br /> PS/CB93-4 Yes No RWOCB says well needed to confirm HydroPunch,Benzene=2.2 ug/L <br /> install well at 5B,use monitoring results to determine if assessment to north is needed <br /> PS/CPT93-5 Yes No Confirm ND line,PS/CP793-5,suggest alternate location near PS/MW-19 as 6B <br /> Proposed C zone Wells <br /> 1C No Upgradient C zone,Confirm PSICPT93-2 <br /> 5C Yes Confirm PS/CPT93-4,benzene=6.2 ug/L <br /> 6C Yes Confirm impacts at PS/CPT93-3.C zone addition to A-B well pair <br /> 7C No C zone addition to A-B pair,B zone impacted,alternate locations suggested <br /> 8C Yes confirm PS/CB93-1,benzene 3.9 ug/L <br /> 9C no C zone addition to A-B pair,B zone impacted <br /> Other C zone Wells wanted by RWOCB <br /> DG Of PS/CPT93-3 No Downgradient of PS/CPT93-3,confirm results,access issue in COGEN area <br /> Alternate locations adjacent to PS/WC-1 s,m and near PS/MW-20 <br /> Confirmation Wells Additional wells to confirm HydroPunch to be determined after additional assessment <br /> Proposed D zone Walls • <br /> 1D <br /> 2D <br /> 3D Yes Confirm PS/CB93-1,benzene 22 ug/L <br /> Other D zone Wells wanted by RWOCB <br /> DG of PSICPT93.3 No Downgradient of PS/CPT93.3,confirm results,access issue in COGEN area <br /> Alternate locations adjacent to PS/WC-1 s,m and near PS/MW-20 <br /> Confirmation Wells Additional wells to confirm HydroPunch to be determined after additional assessment <br /> well designations refer to proposed well locations on Drawings 4 through 7 of the Phase II Assessment Report(EMCON,September 1994) <br /> dmclexceldat/posf ilestwellx.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.