My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L No . D�14 ,93 16 : 54 No .011 P . 04 <br /> Wendy L. Cohen •2- 29 November 1993 <br /> 3. I reminded Messrs. Thun and Lofholm of the items required ill our 18 November 1993 [etter. <br /> These are an ei aluation of remediation alternatives and a time schedule for fast track tasks <br /> specified on Pave 4 of the IRAP to be submitted to the Board by 15 December 1993 and a <br /> progress report every six weeks beginning 30 December 1993. <br /> Mr. Roy Thun .;aid he will summarize the agreements in a letter which will also serve as <br /> response to our 18 November 1993 letter. The schedule for the fast track tasks also will be <br /> included in the Mr. Thun's response and a progress report will be submitted every month <br /> beginning 30 December 1993. <br /> Based oil the above discussion, a conversation with Mr. Steve Lofholm on 29 November 1993, and <br /> our 18 November 1993 letter which directed the S17C to implement the free product recovery <br /> measures and enhanced biodegradation as soon as possible, work on the ]RAP shall be started on 30 <br /> December 1993 at the latest. <br />
The URL can be used to link to this page
Your browser does not support the video tag.