Laserfiche WebLink
L No . D�14 ,93 16 : 54 No .011 P . 04 <br /> Wendy L. Cohen •2- 29 November 1993 <br /> 3. I reminded Messrs. Thun and Lofholm of the items required ill our 18 November 1993 [etter. <br /> These are an ei aluation of remediation alternatives and a time schedule for fast track tasks <br /> specified on Pave 4 of the IRAP to be submitted to the Board by 15 December 1993 and a <br /> progress report every six weeks beginning 30 December 1993. <br /> Mr. Roy Thun .;aid he will summarize the agreements in a letter which will also serve as <br /> response to our 18 November 1993 letter. The schedule for the fast track tasks also will be <br /> included in the Mr. Thun's response and a progress report will be submitted every month <br /> beginning 30 December 1993. <br /> Based oil the above discussion, a conversation with Mr. Steve Lofholm on 29 November 1993, and <br /> our 18 November 1993 letter which directed the S17C to implement the free product recovery <br /> measures and enhanced biodegradation as soon as possible, work on the ]RAP shall be started on 30 <br /> December 1993 at the latest. <br />