Laserfiche WebLink
My . Roy Thun • -4- • 18 November 1993 <br /> 2. Adequate data are already available, at least in Zone A, to allow evaluation of long-term <br /> remedial alternatives such as soil vapor and ground water extraction. This evaluation must <br /> proceed concurrent with ongoing investigations. An evaluation of remediation alternatives <br /> shall be submitted to the Board by 15 December 1993. <br /> 3. A time schedule for fast track tasks specified on Page 4 of the IRAP shall be submitted by <br /> 15 December 1993. <br /> 4. Beginning on 30 December 1993 and every six weeks thereafter, you shall submit a progress <br /> report detailing activities during the reporting period and future work planned. <br /> If you have any questions, please call Philip S. Isorena at (916) 255-3049. <br /> ww � , c40"ll <br /> WENDY L. COHEN <br /> Senior Engineer <br /> PSI:Idj <br /> cc: Mr. Harlin Knoll, San Joaquin County Public Health Services, Stockton <br /> Mr. Alexander Krygsman, Port of Stockton, Stockton <br /> Mr. Steve Rog, Tesoro Petroleum, San Antonio, TX <br /> Mr. Fred Johnson, ST Services, Dallas, TX <br /> Mr. Kevin Murphy, Time Oil Company, Seattle <br /> Mr. Steve Lofholm, EMCON Associates, Sacramento <br /> Mr. Michael L. Branch; Luce, Forward, Hamilton and Scripps; San Diego <br /> Mr. Richard May, The St. Paul Fire and Marine Insurance Co., Brea <br />