Laserfiche WebLink
Mr. Philip Isorena Proposal P93-040.31 <br /> July 12, 1993 <br /> Page 11 <br /> Free product generated from the skimmers will be drummed in a 55-gallon drum. <br /> EMCON will assist the STTC in arranging for appropriate disposal. <br /> Task 12. Reporting <br /> At the conclusion of the phase II assessment, a report will be prepared that documents the <br /> results of work performed under Tasks 1 through 11. Additional information regarding <br /> ]PAR data gaps and potential migration pathways will also be presented. CPT profiles and <br /> boring log information will be evaluated and compared to IPAR stratigraphic and <br /> hydrogeologic information to refine the understanding of site geologic and hydrogeologic <br /> conditions, including the vertical extent of the A-, B-, and C-zones (and D-zone if <br /> required), and the degree of interconnection between the three zones. Geologic <br /> cross-sections will be refined, incorporating the new information. <br /> The analytical data obtained during the field screening and well installation will be <br /> evaluated for assessment of the lateral and vertical extent of B-zone and C-zone impacts. <br /> The data will be compared to IPAR analytical data and to quarterly monitoring analytical <br /> data, and all data will be added to the groundwater analytical database. Site maps will be <br /> prepared showing the distribution of monitoring points and analytical results. <br /> Task 13. Project Management <br /> To complete this program in a timely manner, many activities must occur on schedule to <br /> enable subsequent activities to occur. To achieve success, a moderate amount of project <br /> management will be required. In addition to coordination, other technical support <br /> activities will be necessary to expedite the project. Project related management work not <br /> directly related to the specific tasks previously discussed include <br /> preparation of monthly progress reports for the STTC and RWQCB <br /> communication and attending meetings (if required) with the STTC and the <br /> RWQCB <br /> budget tracking <br /> SAGPROW 93IP9304031.bc-93 Imc:S <br />