My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> Scope of Work - Phase II Site Assessment <br /> Task Description <br /> Task 1 Preliminary Activities <br /> Utility Clearance Submit work location map to facility representatives; <br /> meet with facility representatives to clear access and <br /> known utilities; notify Underground Service Alert, <br /> coordinate clearance with utility companies and <br /> subcontract private locator service; revise CADD base <br /> map <br /> Site Safety Meeting Compile safety procedures for each facility; coordinate <br /> safety compliance with subcontractors; conduct site <br /> safety meeting with EMCON field personnel and <br /> facility representatives; assemble safety equipment <br /> Mobilization Establish a staging area at Tesoro; schedule CPT and <br /> drilling subcontractors; order field materials and well <br /> supplies <br /> Task 2 Resample Seven B-zone Wells Resample seven B-zone monitoring wells (one <br /> upgradient and six downgradient) to confirm earlier <br /> analytical results <br /> Task 3 Resolution of IPAR data gaps Determine the disposition of Port of Stockton well <br /> Well Survey and Site installed during the summer of 1992; determine <br /> Facilities potential impact on wells identified during the well <br /> survey; locate oil-water separators at ARCO and ST <br /> Services <br /> File Review Review RWQCB and San Joaquin County local health <br /> department files for information on recent Sante Fe <br /> Pacific Pipeline and UNOCAL site investigations <br /> Task 4 Limited Phase I Assessment Conduct environmental database review to determine if <br /> of Port of Stockton properties are listed with regulatory agencies <br /> Properties <br /> Conduct review of local regulatory agency files to <br /> determine if files contain information on hazardous <br /> material use and storage; permits for underground of <br /> aboveground storage tanks; and emergency incidents <br /> Determine previous tenants and past land use by <br /> reviewing historic aerial photographs, contacting Port <br /> of Stockton representatives, and reviewing Port of <br /> Stockton records, if possible <br /> Task 5 Cone Penetrometer Testing Perform CPTs to approximately 75 feet to assess <br /> deeper stratigraphy at eight locations to determine the <br /> base of the B-zone, thickness of the B/C aquitard: <br /> extent of the C-zone and hydraulic connection of A-, <br /> B-, and C-zones <br /> SAGPR"93N9304031.bc-93 hnc:5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.