Laserfiche WebLink
Table 1 <br /> Scope of Work - Phase II Site Assessment <br /> (continued) <br /> Task Description <br /> Task 10 Aquifer Testing (Slug Conduct slug test in selected monitoring wells to <br /> Testing) determine preliminary aquifer parameters for <br /> estimating contaminant migration razes <br /> Bail down tests Conduct bail down tests in selected monitoring wells <br /> to determine true product thickness and estimate <br /> product recovery rates <br /> Task 11 Interim Product Recovery Install passive recovery devices in monitoring wells <br /> containing measurable free product <br /> Task 12 Reporting Evaluate the lateral and vertical extent of A-zone, <br /> B-zone, and C-zone impacts based upon analytical <br /> results from Task 8 and quarterly monitoring <br /> Revise understanding of site stratigraphy and <br /> hydrogeology based upon deep CPTs conducted under <br /> Task 5 <br /> Discuss resolution of IPAR data gaps and work <br /> conducted at Santa Fe Pacific Pipeline and UNOCAL <br /> Present limited phase I assessment results on past land <br /> use and previous tenants for determination of other <br /> sources of impacts <br /> Present updated water level, floating product, and <br /> dissolved product concentration maps, and revised <br /> geologic cross-sections <br /> Task 13 Project Management Project kickoff meeting with EMCON and STTC <br /> members <br /> Prepare monthly progress reports <br /> Attend meetings with STTC and RWQCB <br /> Manage budgets <br /> SAC/PRM3\P9304031.be-93 Imc:S <br />