Laserfiche WebLink
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. 93-807 <br /> FOR <br /> STOCKTON TERMINALS TECHNICAL COMMITTEE <br /> SAN JOAQUIN COUNTY <br /> The Stockton Terminals Technical Committee is composed of ARCO Products, ST Services, <br /> Tesoro Alaska Petroleum Company, and Time Oil. The companies have facilities at the Port <br /> of Stockton. <br /> Specific sample station locations are establiwhed under direction of the Board's staff. <br /> Prior to construction, plans and specifications for ground water monitoring and/or extraction <br /> wells shall be submitted to Board staff for review and approval. After construction, new <br /> wells are to be sampled and analyzed for the constituents below and added to the monitoring <br /> program. <br /> GROUND WATER MONITORING <br /> There are 135 monitoring wells and piezometers onsite as shown on Figure 1. Static water <br /> level and free phase petroleum product thickness shall be measured monthly in these <br /> monitoring wells and piezometers. In addition, the ground water monitoring program for 25 <br /> A-zone and eight B-zone wells as shown on Figure 1 and Table 1, and any additional wells <br /> installed subsequently except for wells containing free phase petroleum product or visible <br /> sheen, shall include the following: <br /> Sampling <br /> Constituents Units Type of Sample Frequency <br /> Benzene µg/1 Grab Quarterly <br /> Toluene µg/1 Grab Quarterly <br /> Ethylbenzene µg/1 Grab Quarterly <br /> Xylene µg/1 Grab Quarterly <br /> TPH as diesel µg/1 Grab Quarterly <br /> TPH as gasoline µg/1 Grab Quarterly <br /> Total Lead' µg/1 Grab Quarterly <br /> ' From wells which have not been monitored for total lead. If total lead is detected, <br /> the Discharger shall perform verification sampling within 30 days of submittal of <br /> the monitoring report. If the presence of total lead is not confirmed, no further test <br /> is required. If pollution is verified, the Discharger shall continue monitoring for <br /> total lead quarterly. <br />