My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Port. of Stockton -4- 91 October 1987 <br /> 3. Much work remains to be done for adequate characterization of <br /> site hydrogeology. There is no proposal for determining <br /> those site characteristics which influence the mobility of <br /> contaminants. We don't know which areas are contaminated, <br /> and which areas are threatened. <br /> 4. A plan to characterize and dispose of borehole cuttings and <br /> water purged from wells during the investigation must be, <br /> included in the proposed workplan. <br /> 5. This requirement has been adequately addressed. <br /> 6. In summary, this workplan does not detail those tasks <br /> necessary to completely define the extent of ground water and <br /> soil contamination at the site, nor does it propose <br /> sufficient measures to assess the impacts of site <br /> contamination on water quality in the San Joaquin Delta. <br /> IV. and V. The work plan .did not propose conceptual remedial measures, <br /> or a time schedule for work plan implementation as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.