My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:47:11 AM
Creation date
3/30/2020 11:25:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> 105486 <br /> EXPLANATION <br /> —x x— Property boundaries/fence line <br /> —— —— Pipeline(with pipeline identification) <br /> LS-62 LS-43 8" SPPL pipeline to ARCO <br /> LS-44 8"SPPL pipeline to Time Oil Co, 0 x <br /> LS-45 8"SPPL pipeline to Mobil and Shell <br /> LS-62 8"SPPL main pipeline from Concord Terminal I S-1 <br /> P-26 <br /> • Existing piezometer <br /> 0i <br /> Exploratory trench LS-43 <br /> ® 12"extraction/monitoring well Tesoro I y <br /> SP-3 (approximate locations) Tank Farm <br /> I <br /> " ( SOUTHERN PACIFIC <br /> IPIPELINES, INC. (SPPL) <br /> 0 <br /> I <br /> Time Oil Co. " <br /> Tank Farm Q <br /> O x <br /> Warehouse <br /> }: I <br /> II <br /> ( ' SPPL ( / <br /> Pump House x I Office <br /> 0 0 <br /> 0 0 <br /> 0 <br /> (I �� <br /> 0000 X <br /> I xl <br /> Loading Rack <br /> Loading Rack <br /> II STANDARD <br /> TESORO REFINING, MARKETING x TRANSMISSION <br /> TIME OIL CO. Garage AND SUPPLY COMPANY <br /> OfficeOfflce 0 50 feet <br /> t <br /> 0El <br /> SP-1 SP-2 _ SP _-3 - - SP-5 t <br /> LS-62 LS-45 <br /> CHARTER WAY Figure 1 : <br /> SITE PLAN - INVESTIGATION AREA <br /> P-26® P-25 P-2® Project No. 1767 L E V I N E•F R I C K E <br /> CONSULTING ENGINEERS AND HVDROGEOLOGISTS <br /> MAR88TD <br />
The URL can be used to link to this page
Your browser does not support the video tag.