Laserfiche WebLink
mmff Santa Fe Pacific Pipeline Partners, L.P. T-6075.03 <br /> `. September 14, 1994 Work Plan for Pilot Testing of Air Sparging Page 3 <br /> SCHEDULE <br /> Our project schedule is shown below. We estimate the work to be completed <br /> within six to eight weeks after the initiation of field activities. This project <br /> schedule is tentative . <br /> TASK ACTIVITY COMPLETION DATE <br /> 1 Permitting Week of September 121994 <br /> 2 Air Sparge and <br /> Vapor Probe Installation Week of September 19,1994 <br /> 3 Pilot Test Week of October 10,1994 <br /> 4 Technical Report Week of November 7,1994 <br /> LIMITATIONS <br /> Work for this project will be performed in accordance with generally accepted <br /> professional practices for the nature and conditions of the work completed in the <br /> same or similar localities, at the time the work will be performed. This plan has <br /> been prepared for Santa Fe Pacific Pipeline Partners,L.P.,for specific application <br /> to 2947 Navy Drive in Stockton,California. Assumptions contained within this <br /> document are not intended to represent a legal opinion. No other warranty, <br /> express or implied, is made. <br /> HART CROWSER,INC. <br /> Eric Schniewind, RG. Dharme Rathnayake,Ph D.,P.E. <br /> Project Hydrogeologist Senior Technical Manager <br />