Laserfiche WebLink
SITE HEALTH & SAFETY PLAN <br /> 1.0 INTRODUCTION <br /> A. OVERVIEW <br /> This Site Safety Plan has been prepared by Pacific Environmental Group, Inc. (PACIFIC) for <br /> the well abandonment procedures associated with Well DW-1 at the Shell Bulk Terminal, <br /> located at 3515 Navy Drive, Stockton, California. <br /> 2.0 PROJECT SAFETY AUTHORITY <br /> A. ON-SITE PROJECT SAFETY <br /> Personnel responsible for the project safety are: <br /> Carlton Jordan Environmental Engineer <br /> Shell Oil Products <br /> Company <br /> Douglas Andrews Staff Geologist <br /> Project Safety Officer <br /> (Pacific Environmental <br /> Group, Inc.) <br /> Mark Sullivan Company Safety Officer <br /> (Pacific Environmental <br /> Group, Inc.) <br /> The Project Safety Officer has the authority to upgrade or downgrade the provisions of this <br /> Site Safety Plan as site conditions change. In addition, the Project Safety Officer shall be <br /> responsible for the following: <br /> o Safety Supplies &Equipment Inventory for the Project Site <br /> o Accident/Incident Reporting <br /> 3051351D/SSP2 1 November 2, 1995 <br />