Laserfiche WebLink
9 LATE OF CALIFORNIA-ENVIRONMENTAL PFA�:;TION AGENCY _ _ PETE WILSON,GOVWW <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION ] <br /> 3443 ROUTIER ROAD,SUITE A <br /> SACRAMENTO,CA 95827.3098 <br /> PHONE: (916)255-3000 <br /> FAX: (916)255-3015 RECEIVED" <br /> � �r i I <br /> March 11, 1996 � `�C rrI I�rw V <br /> MAR 14 1996 <br /> ENVIRONMENTAL HEALTH <br /> Mr. Carlton Jordan PERMIT/SERVICES <br /> Shell Oil Company <br /> P.O.Box 4848 <br /> Anaheim,CA 92803 <br /> BULK TERMINAL, STOCKTON: REVIEW OF ANNUAL MONITORING <br /> REPORT FOR 1995 AND SITE STATUS (SAN JOAQUIN COUNTY, Case No. <br /> 3007) <br /> Staff has reviewed the 1995 Annual Monitoring Report,the Additional Site Assessment Report and <br /> the Third Quarter 1995 Monitoring Report for your bulk facility in Stockton. The reports were <br /> prepared by Pacific Environmental Group (PACIFIC) in compliance with Monitoring and <br /> Reporting Program 94-801. <br /> The reports show the existence of a hydrocarbon plume in the"deep" water-bearing zone at the <br /> Stockton facility. Hydrocarbon concentrations were detected in both the now-destroyed well, DW- <br /> S, and its replacement well, DW-2. The reports also show contamination in the Secondary Source <br /> Area 3 (SSA-3), to be lower in the new well,MW-28, than in the older well, MW-27, possibly <br /> indicating that the edge of the plume has been found. <br /> The soil vapor extraction(SVE) system that was scheduled for installation by 1 December 1994 <br /> under the terms of Cleanup and Abatement Order 94-705 has not been implemented,but the reports <br /> indicate that the installations were scheduled for completion in February 1996. Please inform us <br /> in writing when the installation is completed. <br /> Our review finds you in compliance with MRP 94-801. PACIFIC recommends reduction in <br /> monitoring frequency for certain wells on the site. As discussed in the attached staff memo (see <br /> memo, p.3), staff agrees that revision of the MRP should be considered. For the present, <br /> however, staff recommends only the reduction in frequency from semiannual to annual for wells <br /> MW-5 , -6, -7, and -8, providing the monitoring is done during the wet season (first or second <br /> quarter of the calendar year, but no later than April). We will add MW-28 and DW-2 to the <br /> quarterly monitoring program. We anticipate accomplishing this in time for your second 1996 <br /> quarterly monitoring round. Further revisions will be considered after better understanding of the <br /> SSA-3 and deep zone conditions are achieved,there has been time to assess the effects, if any, of <br /> the recent spill, and the combined effects of the SVE system and the ground water extraction have <br /> been observed. <br />