Laserfiche WebLink
22-Jun-07 <br /> Sampling Assembly <br /> ------------ <br /> i <br /> Vacuum Guage <br /> Qouti®based on type of Summa c is UW) <br /> I ' <br /> I <br /> I <br /> O 1 L or 1.7 L <br /> I <br /> O Summa <br /> I �\ Cannister ' <br /> Surface Completion i + Connector <br /> (flush mounted well box) 1/4"O.D. <br /> Teflon Tubing <br /> �—-Sampling Port I <br /> (shut-off valve) <br /> 1/4 " LD. <br /> 6' Teflon Tubing <br /> 12" <br /> Concrete <br /> — 3.5"Diameter Boring <br /> 2.5' <br /> 3' <br /> 5.5' <br /> 6' Bentonite <br /> Bentonite <br /> Filter Pack Silica Sand <br /> 3" Stainless Steel Screen Implant <br /> Implant Anchor FIGURE <br /> 3 <br /> a <br /> N <br /> Shell Stockton Terminal Typical Soil Vapor Probe <br /> 3515 Navy Drive � ';_. Construction Diagram <br /> Stockton, California <br /> & <br /> corvsr I novens <br /> &ASSOCIATES <br />