My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005550
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
ARCHIVED REPORTS_XR0005550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
3/30/2020 2:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005550
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secor com <br /> SC O Rn INTERNATIONAL 3017 Kilgore Road Suite 100 <br /> G INCORPORATED Rancho Cordova,CA 195670 <br /> 916-861-0400 TEL <br /> oil f 916-801-0430 Fm <br /> Apnl 30, 2004 �ID <br /> 1E (COn/ E <br /> APR 2920044 <br /> Harlin Knoll <br /> San Joaquin County ENVIRONMENT HEALTH <br /> Environmental Health Division PERMIT/SERVICES <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> RE Chevron Groundwater Monitoring Report(1Q2004) <br /> Chevron Service Station 9-2396 <br /> 25651 Highway 99 North <br /> Acampo, California <br /> SECOR Project No 77CH 00000 23 0012 <br /> Dear Mr Knoll <br /> SECOR International Incorporated is providing this report to summarize the recently completed <br /> groundwater monitoring event at the above referenced site <br /> COMPLETED ACTIVITIES - FIRST QUARTER 2004 <br /> Conducted quarterly groundwater monitoring and sampling <br /> J� Prepared and submitted quarterly groundwater monitoring report <br /> PROPOSED ACTIVITIES - SECOND QUARTER 2004 <br /> • Conduct quarterly groundwater monitoring and sampling <br /> • Prepare and submit quarterly groundwater monitoring report <br /> • Prepare and submit a closure request summary <br /> DISCUSSION <br /> On January 29, 2004 Gettler-Ryan, Inc (G-R) performed the first quarter groundwater monitoring <br /> and sampling event for 2004 G-R's groundwater monitoring report is included as Attachment A <br /> Depth to groundwater across the site was approximately 78 feet below ground surface <br /> Groundwater elevation across the site decreased an average of 0 650 feet from the previous <br /> sampling event Groundwater flow was to the south at an approximate gradient of 0 002 ft/ft A <br /> summary of laboratory results are listed below <br /> 1 4ChevronW3961Penodic Monitonng1200411Q2004 QMR 92396 doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.