My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005551
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
ARCHIVED REPORTS_XR0005551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
3/30/2020 2:21:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005551
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secorcom <br /> ® INTERNATIONAI- 3017 Kilgore Road Suite 100 <br /> INCORPORATED Rancho Cordova CA 95670 <br /> 916-6610400 TEL t <br /> 916 861-0430 FAX <br /> January 23, 2004 <br /> ��c��y <br /> JAN 2 7 2004 <br /> Harlin Knoll ENVIRONMENT ht=,y�7H <br /> San .Joaquin County P��M�1/S�RVIC $ <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> RE Chevron Groundwater Monitoring Report (402003) <br /> Chevron Service Station 9-2396 <br /> 25651 Highway 99 North <br /> Acampo, California <br /> SECOR Project No 77CH 00000 09 0010 <br /> Dear Mr Knoll <br /> SECOR International Incorporated is providing this report to summarize the recently completed <br /> groundwater monitoring event at the above referenced site <br /> COMPLETED ACTIVITIES - FOURTH QUARTER 2003 <br /> ■ Conducted quarterly groundwater monitoring and sampling <br /> ■ Prepared and submitted quarterly groundwater monitoring report <br /> PROPOSED ACTIVITIES - FIRST QUARTER 2004 , <br /> Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> IN Prepare and submit a closure request summary <br /> DISCUSSION <br /> On October 31, 2003, Gettler-Ryan, Inc (G-R) performed the fourth quarter groundwater monitoring <br /> and sampling event for 2003 G-R's groundwater monitoring report is included as Attachment A <br /> Depth to groundwater across the site was approximately 79 feet below ground surface <br /> Groundwater elevation across the site decreased an average of 1 91 feet from the previous sampling <br /> event Groundwater flow was to the south at an approximate gradient of 0 003 ft/ft A summary of <br /> laboratory results are listed below <br /> k <br /> 4 <br /> r� <br /> 9� <br /> a� <br /> d <br /> 1 <br /> I 1Chevronl923961Penodtc Monitonng120031402003 QMR 92396 doc SECOR International Incorporated <br /> �r� <br />
The URL can be used to link to this page
Your browser does not support the video tag.