My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005553
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
ARCHIVED REPORTS_XR0005553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
3/30/2020 2:22:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005553
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secorcom <br /> INTERNATIONAL <br /> S E C ® R INCORPORATED 3017 Kilgore Road,Suite 100 <br /> p� Rancho Cordova,CA 95670 <br /> 916-661-0400 mL <br /> 916-861-0430 FAX <br /> July 7, 2003 <br /> Harlin Knoll <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> RE Chevron Groundwater Monitoring Report (2Q2003) <br /> Chevron Station 9-2396 <br /> 25651 Highway 99 North <br /> Acampo, California <br /> SECOR Project No 77CH 00000 09 0010 <br /> Dear Mr Knoll <br /> SECOR International Incorporated is providing this report to summarize the recently <br /> completed groundwater-monitoring event at the above referenced site The site is located at 25651 <br /> Highway 99 North, Acampo, California <br /> COMPLETED ACTIVITIES - SECOND QUARTER 2003 <br /> • Conducted quarterly groundwater monitoring and sampling <br /> • Prepared and submitted quarterly groundwater monitoring report <br /> PROPOSED ACTIVITIES - THIRD QUARTER 2003 <br /> • Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R) This <br /> groundwater monitoring and sampling event was performed on April 24, 2003 G-R's groundwater <br /> monitoring report is included as Attachment A Depth to groundwater across the site was <br /> approximately 75 feet below ground surface Groundwater elevation across the site increased an <br /> average of 1 037 feet from the previous sampling event Groundwater flow was to the southeast at <br /> an approximate gradient of 0 002 ft/ft A summary of laboratory results are listed below <br /> 1 lChev=1923961Penodic Monitonng1200312Q2003 QMR 92396 doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.