Laserfiche WebLink
SECOR www secor corn <br /> INTERNATIONAL 3017 Kilgore Road,Suite 100 <br /> S E (_ ® R INCORPORATED Rancho Cordova,CA 95670 <br /> 916-81-0400 TEL <br /> 916-86610430 FAX <br /> April 22, 2003 <br /> ECOVED <br /> Harlin KnollA� Q 2 2003 <br /> San Joaquin County <br /> Environmental Health Division EWVIRUNmENT HEALTH <br /> 304 East Weber Avenue, Third Floor pEgMlf/SERVICES <br /> Stockton, CA 95202 <br /> RE Chevron Groundwater Monitoring Report (102003) <br /> Chevron Station 9-2396 <br /> 25651 Highway 99 North <br /> Acampo, California <br /> SECOR Project No 77CH 00000 00 0027 <br /> Dear Mr Knoll <br /> SECOR International Incorporated Is providing this report to summarize the recently <br /> completed groundwater-monitoring event at the above referenced site The site is located at 25651 <br /> Highway 99 North, Acampo, California <br /> COMPLETED ACTIVITIES - FIRST QUARTER 2003 <br /> Conducted quarterly groundwater monitoring and sampling <br /> • Prepared and submitted quarterly groundwater monitoring report <br /> PROPOSED ACTIVITIES FOR SECOND QUARTER 2003 <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R) This <br /> groundwater monitoring and sampling event was performed on January 29, 2003 G-R's <br /> groundwater monitoring report is included as Attachment A Depth to groundwater across the site <br /> was approximately 77 feet below ground surface Groundwater elevation across the site increased <br /> an average of 0 59 feet from the previous sampling event Groundwater flow was to the southeast at <br /> an approximate gradient of 0 002 ft/ft A summary of laboratory results are listed below <br /> 3 <br /> I <br /> 4 <br /> 1x <br /> y <br /> 11Chevron19239MPenodic MonrtonngW0311Q2003 QMR 92396 doc SECOR International Incorporated <br />