My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005554
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
ARCHIVED REPORTS_XR0005554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
3/30/2020 2:22:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005554
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secor corn <br /> INTERNATIONAL 3017 Kilgore Road,Suite 100 <br /> S E (_ ® R INCORPORATED Rancho Cordova,CA 95670 <br /> 916-81-0400 TEL <br /> 916-86610430 FAX <br /> April 22, 2003 <br /> ECOVED <br /> Harlin KnollA� Q 2 2003 <br /> San Joaquin County <br /> Environmental Health Division EWVIRUNmENT HEALTH <br /> 304 East Weber Avenue, Third Floor pEgMlf/SERVICES <br /> Stockton, CA 95202 <br /> RE Chevron Groundwater Monitoring Report (102003) <br /> Chevron Station 9-2396 <br /> 25651 Highway 99 North <br /> Acampo, California <br /> SECOR Project No 77CH 00000 00 0027 <br /> Dear Mr Knoll <br /> SECOR International Incorporated Is providing this report to summarize the recently <br /> completed groundwater-monitoring event at the above referenced site The site is located at 25651 <br /> Highway 99 North, Acampo, California <br /> COMPLETED ACTIVITIES - FIRST QUARTER 2003 <br /> Conducted quarterly groundwater monitoring and sampling <br /> • Prepared and submitted quarterly groundwater monitoring report <br /> PROPOSED ACTIVITIES FOR SECOND QUARTER 2003 <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R) This <br /> groundwater monitoring and sampling event was performed on January 29, 2003 G-R's <br /> groundwater monitoring report is included as Attachment A Depth to groundwater across the site <br /> was approximately 77 feet below ground surface Groundwater elevation across the site increased <br /> an average of 0 59 feet from the previous sampling event Groundwater flow was to the southeast at <br /> an approximate gradient of 0 002 ft/ft A summary of laboratory results are listed below <br /> 3 <br /> I <br /> 4 <br /> 1x <br /> y <br /> 11Chevron19239MPenodic MonrtonngW0311Q2003 QMR 92396 doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.