Laserfiche WebLink
7.0 RECOMMENDATIONS <br /> Based on the results of Dames&Moore's Phase I Environmental Assessment of the subject <br /> property, further investigation appears to be warranted. <br /> • Because the truck wash drain that flows into the clarifier was backed up during our site visit, <br /> and similar observations were noted in each of the previous consultant reports, the clarifier <br /> is either full or not operating properly. The contents of the clarifier should be emptied by a <br /> licensed waste hauler for disposal. The truck wash area is not currently utilized. Prior to <br /> future use, the condition of the clarifier and evaporation pit should be evaluated. If the <br /> system will not be utilized, it should be appropriately closed. <br /> Soil conditions previously evaluated in the vicinity of the clarifier/evaporation pit area did <br /> not indicate soil contamination extends into groundwater. However, Fremont may wish to <br /> evaluate the potential for groundwater impacts in this area. <br /> • Outside of Building C, American Modular Systems spray paints metal frames directly atop <br /> bare soil. This practice has covered the surface with red oxide, latex paint which has not <br /> likely created an environmental issue. However,the type of paints and materials used at this <br /> location in the past are unknown; therefore,Fremont may wish to further evaluate subsurface <br /> conditions in this area. <br /> • Additional agency review should be performed to confirm the existence and proper <br /> abandonment of the water well identified on the property. <br /> RAMN\981CM.013 24 <br /> DAMES& MOORE <br />