My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0505873
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
3/30/2020 4:51:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505873
PE
2960
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
01
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Nolte and Associates, Inc. MONITORING WELLS <br /> h. Installed wells shall be free of extraneous objects or materials (e.g., tools, <br /> pumps, bailers, soils, grout, etc.). <br /> 3.07 SAMPLING AND LABORATORY ANALYSIS <br /> Before taking any water samples, the selected strata shall be pumped for at least 2 hours to ensure a <br /> representative water sample. During the 2-hour pump test, the pumping rate and water level in the <br /> casing shall be measured and recorded every one-half hour. At the end of the pump test, the <br /> Contractor shall retrieve at least 3 gallons of water sample from each of the selected independent <br /> strata encountered in the test hole. Water samples shall be collected by an approved water sample <br /> pump. Water samples shall be submitted by the Contractor for laboratory analysis for the following <br /> parameters: <br /> Total Hardness <br /> Calcium (Ca) <br /> Magnesium (Mg) <br /> Sodium (Na) <br /> Potassium (K) <br /> Total Cations <br /> Total Alkalinity <br /> Hydroxide Alkalinity <br /> Carbonate Alkalinity <br /> Bicarbonate Alkalinity <br /> Sulfate (SO4) <br /> Chloride (Cl) <br /> Nitrate (NO3-N) <br /> Fluoride (F) <br /> Total Anions <br /> pH <br /> Specific Conductance (EC) <br /> Total Dissolved Solids (TDS) <br /> Copper (Cu) <br /> Iron (Fe) <br /> Manganese (Mn) <br /> Zinc (Zn) <br /> In addition, organics analyses shall be performed utilizing EPA Methods 601 and 602. The cost <br /> for all laboratory analyses shall be included in the bid. <br /> 3.08 CLEANUP <br /> Following completion of his work, the Contractor shall remove from the premises and work <br /> areas all excess materials, tools, and equipment used in the execution of his work, and shall <br /> properly dispose of all debris resulting from his work. <br /> END OF SECTION <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.