Laserfiche WebLink
� a - <br /> k'% KLEINFELDER <br /> I <br /> File No. 20-3941-01.E01 <br /> May 19, 1997 <br /> r t <br /> WMRE`ODISPOSED <br /> ri DRiJ141< s MANY OTHER__ APPROXIlI�IATE � i "E <br /> y,� 'k".lr.jr ,y .Y�- � <br /> 2-3 EZ-4A 100%full of soil As cover material an the levee road surrounding <br /> Ponds II, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 2-3 EZ-6A 100%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 2-4 ARCO 100%full of soil As cover material on the levee :road surrounding <br /> Ponds I1, 12, 15 and 19 of the Escalon Waste <br /> -'Water_TreatmentPlant <br /> 2-1 EZ-2A 100%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 2-4 ARCO 8A 40%full of soil As cover material on the levee road surrounding <br /> Ponds 1I, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 2- Drilling Rinseate 20%full of water In Pond 5 of the Escalon Waste Water Treatment <br /> [EZ-5A] Plant <br /> 2-2 EZ-7A 90%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 2-1 EZ-3A 100%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 2-2 EZ-l A 100%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 22 1'-55' 100%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> B24 30-55' 100%full of soil As cover material on the Ievee road surrounding <br /> - <br /> Ponds`11,"`12;-i5-and'19"of.-the-Escalon-"Waste - <br /> Water Treatment Plant <br /> B24 1-55' 75%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> 22 1 1-55' 100%full of soil As cover material on the levee road surrounding <br /> Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> B-23 marachi farms on 25%full of soil As cover material on the levee road surrounding <br /> McHenry Ponds 11, 12, 15 and 19 of the Escalon Waste <br /> Water Treatment Plant <br /> B-24 10%full of water In Pond 5 of the Escalon Waste Water Treatment <br /> Plant <br /> - I <br /> 10-3941-OLE0112017LO99 Page No.2 of 3 Capyright 1997,Kleinfelder,Inc. <br />