My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
0
>
2900 - Site Mitigation Program
>
PR0506239
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
3/30/2020 4:55:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506239
PE
2950
FACILITY_ID
FA0007296
FACILITY_NAME
CITY OF ESCALON
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
HWY 120
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-3941-01.E01 �� K t E I N F E L D E R <br /> March 6, 1997 <br /> APPR03MWATE PROJECT TIlgE SCHEDULE <br /> Upon receipt of our signed contract, the estimated time schedule for our work will be as <br /> follows: <br /> STANDARD ANALYTICAL TURN-AROUND TIME <br /> Approximate Time Task <br /> Week 0 Notification of proposal acceptance in writing (signed contract) <br /> Week 0 - 1 Task EOI - Permitting* and pre-field activities <br /> Week 2 Task E02 - Drilling of three soil borings <br /> Task E02(a) -Drilling of one optional soil boring <br /> Week 2 - 3 Chemical Analysis** <br /> Week 4 - 5 Task E03 - Reporting <br /> Week 5 Draft report submitted to the City of Escalon and Nolte and <br /> Associates <br /> * Kleinfelder has no control over permitting review time by regulatory agencies involved with <br /> the project. Therefore, Kleinfelder is not responsible for the impact/result of delays by <br /> others (e.g., Regulatory Agencies). It is possible that delays could occur; however, <br /> Kleinfelder will make every reasonable effort to expedite the process. <br /> ** Kleinfelder has no control over chemical analysis involved with the project. It is possible <br /> that delays could occur; however, KleinfeIder will make every reasonable effort to expedite <br /> the process. <br /> LMTATIONS <br /> Kleinfelder offers various levels of investigative and engineering services to suit the varying <br /> needs of different clients. Although risk can never be eliminated, more-detailed and extensive <br /> investigations yield more information, which may help understand and manage the level of risk. <br /> Since detailed investigation and analysis involves greater expense, our clients participate in <br /> determining levels of service which provide adequate information for their purposes at <br /> acceptable levels of risk. Acceptance of this proposal will indicate that the City of Escalon has <br /> reviewed the scope of work and determined that it does not need or want a greater level of <br /> service than will be provided. Any exceptions should be noted and may result in higher fees. <br /> 20-3941-OI.E01/207PE075 Page 7 of 9 0 1997, Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.