My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
0
>
2900 - Site Mitigation Program
>
PR0506239
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
3/30/2020 4:55:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506239
PE
2950
FACILITY_ID
FA0007296
FACILITY_NAME
CITY OF ESCALON
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
HWY 120
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y� I <br /> J y <br /> File No. 20-3941-0LEO 1 KLEINFELDER <br /> March 6, 1997 <br /> PROPOSAL <br /> LIMITED SOIL ASSESSMENT <br /> ARCO GAS MINI-MART <br /> 1305 ESCALON AVENUE <br /> (APN 225-100-03) <br /> ESCALON,CALIFORNIA <br /> INTRODUCTION <br /> Kleinfelder is pleased to present this revised proposal to The City of Escalon. This proposal <br /> was developed after correspondence with Mr. Marvin Miller of Nolte and Associates, using <br /> Kleinfelder's current understanding of the site conditions, and is a preliminary understanding of <br /> your desires and requirements. .We have prepared this proposal based on information usually <br /> requested in a workplan by the San Joaquin County Public Health Services Department, <br /> Environmental Health Division(PHS/EHD) and the State of California Regional Water Quality <br /> Control Board Central Valley Office (RWQCB). <br /> Kleinfelder is committed to providing a high level of service to its clients, commensurate with <br /> their wants and needs. if a portion of this proposal does not meet the needs of the client, or if <br /> those needs have changed, Kleinfelder stands ready to: consider appropriate modifications, <br /> subject to the standards of care to which we adhere as professionals. Modifications such as <br /> changes in scope, methodology, scheduling, and contract terms and conditions may result in <br /> changes to the risks assumed by the client, as well as adjustments to our fees. We look forward <br /> to the opportunity to serve you. <br /> BACKGROUND <br /> Kleinfelder has conducted a limited environmental subsurface investigation for the Highway <br /> 120/McHenry Avenue improvement project (Kleinfelder File No. 20-3941-OLE01). Since that <br /> time the proposed alignment has changed, necessitating a boring be placed south of the ARCO <br /> tank cluster. <br /> 20-3941-01.E01/207PE076' Page 1 of 8 0 1997, Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.