Laserfiche WebLink
NCU 8 ' 96 16 : 32 FR LEVINE F ICKE 510 6524906 TO 12094640138 P.02i05 <br /> 604 'i J <br /> Novemlxr 8, 1996 3966A54I 12 <br /> Yia ju=t rite and reguor mai! <br /> Mary kleays,R.&.H_S. <br /> San]oaquvt C=ounty Public Health Servim <br /> Environmental llralili Divisitar <br /> 304 E.Weber Avenue,Third Floor <br /> P.O. 9M 398 <br /> y,-top, Cow 95201.0388 <br /> Subject: Coitiiaratipa of Well Permit for Mottitariag Well MW-10I, Lincoln Center, Swckma, <br /> California <br /> Dear Mary: <br /> Ixvirlc•Fridtr•Re:wo Gk. (IFR)has iecently completed the.installation of monitoring wrli <br /> MW-100 at the Lnv olit omw Site(dw LC Site:we attached site vkhtity map) in Stockton. <br /> C alifuruia. Itis well was iftvilled by Spectrum Exploration 1nt., under the supervision of LFR. <br /> TFR wilt install twn additiatim momtonag wells.MW 101 wo MW 1172, in tote immediate vicinity <br /> of monitorinA welts MW-100 aero MW-11 at thr If_' Site(see auarl" LC Site plan) M000 toe <br /> welt MW-101 WW be installed on the night of Wednesday. November 13,and the morning of <br /> Thursday, Novraubei I4, 1996. Currfmly,we dp nut have a v:heAila for imtallirtg rnrmirnring <br /> well M-W- 102, and will notify you at least 72 haus before the installation of this well.We <br /> unelra stand tluat we are authorized to install uheso wells under the existing PGTIMt for MW-100 <br /> (permit#10792, issued October 25, 1996), filed in your office Ley Adam Klein of IFR on October <br /> 17, 1996, becw=the Same subcontractor fC SJ ImceuSee). Spect om ESxploranon I=..will perform <br /> tie work 9W The work is in the smite aswssnl+s parl-el. <br /> Monitoring welt MW-101 will be 4 inches in diameter to a total depth of approxiraatety 75 feet <br /> below grouttd Sulfate(bgs), The screetr for MW-101 will be comtrucitxl of stairile5.s stee-1 and set <br /> across the So to 75 feet bgs interval.Thu filter pack material for MVV 101 will be detenni ied in <br /> die field and will be imudicd acioss the 45 to 75 Elect bgs interval. <br /> M[mitnring well MW-102 will be 4 inCW in diameter to a total depth of ap"knftmlY 75 feet <br /> bgs.The screen far MW-162 will be cu4 4.ucTcd of stainless steel and vet atmss the 70 to 75 feet <br /> bgs interval. The filter pack material for MW-1(12 will be determined to the field and will be <br /> i imlled across the 68 to 75 foci bgs interval. <br /> We will notify y"r Oft hours before the installation of MW 101 to schedule grout inspection, <br /> anticipated for Tharsday, November 14, 1996. <br /> 1000 vowel) Strout, Ira Fl0o1, E"rywita. ceiromia W608 IA1T•Is1A)AV. P"• rni)51n)A5A-724a.6Rices tWridwids <br />