Laserfiche WebLink
r�STATE1%OF CALIFORNIA GEORGE DEUKMEJIAN.Governor <br /> {CALIFORNIA REGIONAL WATE , QUALITY CONTROL BOARD— • <br /> CENTRAL VALLEY REGION <br /> W3 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> yl_ <br /> 17 March 1988 <br /> ENVIROMENTAL HEAL <br /> H <br /> Mr. Wilbur H. Smith <br /> Lincoln Properties Limited <br /> 628 Lincoln Center <br /> Stockton, CA 95207 <br /> APPROVAL OF WORKPLAN AS AMENDED, GROUND WATER INVESTIGATION, <br /> LINCOLN VILLAGE CENTER, STOCKTON, SAN JOAQUIN COUNTY <br /> I discussed the boring and sampling aspects of the subject <br /> workplan in a telephone conversation with Gerry Nakano of <br /> Leedshill-Herkenhoff Consultants. He said the sampling methods <br /> discussed in his 1 March 1988 letter to the Regional Board were <br /> to be carried out through the entire length of the borings at the <br /> monitoring well locations. With this understanding, we approve <br /> the workplan as submitted and amended. <br /> We request you notify us at least one week before any on-site <br /> subsurface work is started so that we have the opportunity to <br /> observe procedures and split samples of soil and ground water. <br /> As stated in our 9 March and 23 February 1988 letters, the <br /> Technical Report including results from this investigation, and <br /> recommendations for further work is still due to the Regional <br /> Board by 24 June 1988. <br /> If you have any further questions, please contact me at (916) <br /> 361-5681. <br /> ROBERT L. NIBLACK <br /> Engineering Geologist <br /> RLN <br /> cc: see attached list <br />