My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1987-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1987-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:01:00 PM
Creation date
3/31/2020 2:27:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1987-1992
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r�STATE1%OF CALIFORNIA GEORGE DEUKMEJIAN.Governor <br /> {CALIFORNIA REGIONAL WATE , QUALITY CONTROL BOARD— • <br /> CENTRAL VALLEY REGION <br /> W3 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> yl_ <br /> 17 March 1988 <br /> ENVIROMENTAL HEAL <br /> H <br /> Mr. Wilbur H. Smith <br /> Lincoln Properties Limited <br /> 628 Lincoln Center <br /> Stockton, CA 95207 <br /> APPROVAL OF WORKPLAN AS AMENDED, GROUND WATER INVESTIGATION, <br /> LINCOLN VILLAGE CENTER, STOCKTON, SAN JOAQUIN COUNTY <br /> I discussed the boring and sampling aspects of the subject <br /> workplan in a telephone conversation with Gerry Nakano of <br /> Leedshill-Herkenhoff Consultants. He said the sampling methods <br /> discussed in his 1 March 1988 letter to the Regional Board were <br /> to be carried out through the entire length of the borings at the <br /> monitoring well locations. With this understanding, we approve <br /> the workplan as submitted and amended. <br /> We request you notify us at least one week before any on-site <br /> subsurface work is started so that we have the opportunity to <br /> observe procedures and split samples of soil and ground water. <br /> As stated in our 9 March and 23 February 1988 letters, the <br /> Technical Report including results from this investigation, and <br /> recommendations for further work is still due to the Regional <br /> Board by 24 June 1988. <br /> If you have any further questions, please contact me at (916) <br /> 361-5681. <br /> ROBERT L. NIBLACK <br /> Engineering Geologist <br /> RLN <br /> cc: see attached list <br />
The URL can be used to link to this page
Your browser does not support the video tag.