My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1987-1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1987-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:01:00 PM
Creation date
3/31/2020 2:27:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1987-1992
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ,^0T OF CALIFORNIA �i�� �GE DEUKMEJIAN.Governor <br /> CAL11`ORNIA REGIONAL WATER QUALITY CONTROL BOARD— %� .i•. <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827.3098 <br /> 23 February 1985 FFB Z4 1533 <br /> ,LFUISHII L.ateRl(Er:R0FF <br /> Mr. Wilbur H. Smith <br /> Lincoln Properties Limited <br /> 628 Lincoln Center <br /> Stockton, CA 95207 <br /> REVISED GROUND WATER INVESTIGATION WORKPLAN, LINCOLN VILLAGE <br /> CENTER, STOCKTON, SAN JOAQUIN COUNTY <br /> Ground water contamination with dry cleaning solvents at Lincoln <br /> Village Center has been confirmed in public supply wells. For <br /> the most part, the workplan and proposed revisions which have <br /> been submitted are of adequate scope for a preliminary <br /> investigation. However, the proposed ground water component of <br /> that plan remains incomplete. <br /> As we discussed, the ground water investigation will not meet the <br /> goal of providing geological data needed to determine whether <br /> confining layers or contaminant pathways can be correlated <br /> between borings. In addition, it may be difficult to locate the <br /> first water-bearing zone and properly place the screened interval <br /> of the monitoring wells, which is necessary for a proper <br /> determination of ground water gradient. The workplan revision we <br /> agreed on in our telephone conversation, which calls for <br /> continuously coring two boreholes rather than one, will help to <br /> ease the above concerns. If Lincoln Properties Limited chooses <br /> to proceed with the workplan including proposed revisions as they <br /> stand, additional borings may be required to characterize the <br /> geology in the areas where wells with "mud-logged" borings are <br /> being installed. If wells installed in this phase of the <br /> investigation are not screened across the water table, additional <br /> wells will be required to provide water table elevations. The <br /> other tasks of the workplan are adequate as proposed for this <br /> phase of the investigation. <br /> Please notify us at least one week before any on-site subsurface <br /> work is started so that we have the opportunity to observe <br /> procedures, and split samples of soil and ground water. <br /> We request you submit the Technical Report including results from <br /> this investigation, and recommendations for further work by 24 <br /> June 1988. This is based on the time schedule you proposed in <br /> the workplan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.