Laserfiche WebLink
TEL No . Jan 11 ,95 11 :34 No .009 P .01 <br /> Post-It" brand fax transmittal memo 7679 a or m"o 2 <br /> r. MAI? f kL- iSol� SNA <br /> Co. em 7574 Shoreline Drive. <br /> oa�1SJG IlS a� W Stockton, California 95219 <br /> TaxaTelephone: (209) 952-6262 <br /> /W.4--11)I'KV Fax: (209) 952-2331 <br /> JAN 1995 <br /> ENVIRONMENTAL451F R 1-224 LETTER REPORT <br /> PERMIT/SERVICES <br /> To ALL INTERESTED PARTIES <br /> IDENTIFIED ON ATTACHED LIST <br /> Re: Lincoln properties, Ltd. v. HJ%Lins,,_,,,et al. , Case No. CIV-S- <br /> 91-76U DFL (GGH) : Letter Report Submitted Pursuant to <br /> Permanent Injunction <br /> Dear Interested Parties: <br /> This information is provided pursuant to Sections IV(A) (1) (f) and <br /> IV(F) (Letter Reports) of the Permanent -injunction Governing <br /> Investigation, Monitoring, and Testing of Hazardous Substance <br /> contamination at and Emanating from Lincoln Center ("Permanent <br /> Injunction^) issued by Judge Levi, and filed on August 16, 1993. <br /> The Permanent injunction specifies that the Letter Reports shall <br /> contain any data generated in the course of the Remedial <br /> Investigation, Risk Assessment, Feasibility Study, and Treatability <br /> Study not previously submitted in draft or final reports or in <br /> previous letter reports. <br /> Since the Letter Report of October 1994 no data has been generated <br /> as specified by the Permanent Injunction. <br /> However, data from the site is currently being generated which will <br /> be included in the next letter report. On November 20-21, 1994 the <br /> Dry Cleaning Defendants began implementation of the Focused <br /> Sampling and Analysis Plan (SAP) by sampling the monitoring wells <br /> at Lincoln Center for the first time since December 1990. This <br /> sampling was necessary to confirm the conditions at the site prior <br /> to submittal of the Final Workplan called for in the Permanent <br /> injunction. <br /> Upcoming Activity: <br /> The samples taken as part of the Focused SAP are currently being <br /> analyzed and the Final Workplan will be submitted 6 weeks after the <br /> analytical results are returned from the lab. <br /> c ; <br /> r <br />