Laserfiche WebLink
I <br /> i <br /> r 2 BILL OF MATERIALS <br /> f-� --- -° a ITCH QTY DESCRIPTICIN MFG PART NO. <br /> 1 1 ENCLOSURE 14X]2XI8 HOFFMAN A-14128CH <br /> 3 4 WIREWAY <br /> — _ <br /> u� W 2 I HACKPLATE A-14P12 <br /> U €B a a ENCLOSURE €2XIOXB A-€2108CH <br /> Lam' I 4 1 BACKPLATE A-12PIO <br /> 12C C N LSLH LSHH -© _- _ CI 5 30 TERMINALS ALLEN BRADLEY 1492-W6 3 �_ _ <br /> l3 14 i3 14 11 8 6 l END _ 1492-EB3 <br /> 7 1 HARRIER 1492-EA35 <br /> 175' 1.75" WIREWAY W€REWAY - --- <br /> 8 _€� cONTnC10R ID0-Al2ND3 <br /> GND GND 9 1 PILOT LIGHT PTT WHITE 80OT-PT€6W <br /> EE 10 1 1 I I GREEN 13BDT-PT16G <br /> ]5 M"61 15 5 6 7 U 1 SELECTOR SWITCH 2 POS 80DT-H2D1 <br /> n ° 12 1 1 { 3 PUS BURT-J2A <br /> L3 2 LEVEL RELAY WARRICK 16MB1M0 <br /> 14 2 RELAY BASE €DEC SR2P-06 <br /> ENCLOSURE LAYOUT & DETAILS INNER PANEL LAYOUT ENCLOSURE LAYOUT & DETAILS INNER PANEL LAYOUT -- 2 GROUND LUG IESCU 1A-4 <br /> _—_.._SCALE - I'--1/4' -� SCALE - 1' = 1/4' SCALE - I' = I/4' <br /> SCALE - V = 1/4" l5 <br /> PANEL ` ina - PANEL PANZ <br /> PANEL <br /> IELH FIELD <br /> IELD <br /> NAMEPLATE ENGRAVING SCHEDULE <br /> LEGEND <br /> I TREATMENT CONTROL PANEL <br /> TERMINAL WIRING TERMINAL WIRING 2 LIGHTING CONTROL PANEL <br /> 3 POWER <br /> 4 TREATMENT PUMP <br /> 5 AREA LIGHTS <br /> A ON <br /> B RUN <br /> TREATMENT CONTROL PANEL LIGHTING CONTROL. PANEL a HAND OFF AUTO <br /> D PHOTO CELL/ PE BYPASS <br /> BACK END <br /> 4'0 PVC VALVE <br /> AND PIPE (I' FROM <br /> TANK BOTTOM) <br /> 4'0 PVCVALVE AND PIPE WAR FUTURE EFFLUENT WATER 1/2' _ <br /> (FOR FU iURE CONNECTION? STAINLESS STEEL CLEARANCE CONCRETE <br /> STORAGE <br /> /� (TO TREATMENT UNIT) TANK ANGLE BRACKET PAD <br /> ST❑RAGE (SE£ NOTE €2 WATER <br /> TANK <br /> ^NK END CAP �� ON SHEET 2) TANK <br /> 6. <br /> EN➢ CAP (SUPPLIED HY ""� 7/9'0 HILT) HVA _ <br /> L£VIN£tFRICKE) WITH TiREAOED ROD <br /> CAMLDCK FITTING — - <br /> (SEE CIV€L MOTE 13 , <br /> 2"0(VALVE AND FROM SUMPS 6' — --- ON SHEET 2) <br /> PIPE <br /> 6' <br /> Q' FROM TOP OF TANK 12• <br /> FRONT END 3'0 VALVE AND PIPE PLAN VIEW SIDE VIEW <br /> (I' FROM TOP OF TANKS - <br /> 3' CAMLOCK <br /> (PURL£ WATER <br /> CONNECTION <br /> TANK RESTRAINT BRACKET DETAIL <br /> 4 N-Ts- <br /> A TANK DETAILS <br /> 7 N.T.S. <br /> REVISION DESIGN DAWN CHECKED DATE Project <br /> AS SHOWN �I� STORAGE AND OPERATIONS COMPOUND 3966 <br /> $ <br /> - - RWft APPROVED 3- SCALE : Lq, LEVINE*FRICKE E�'�llNN/N�y�' LINCOLN CENTER Raie <br /> I INA1 ISSUED FOR DID RDG RDG/NNM RWC 9/6/96DESIGN RDG � �� cy ?. SEPT. 96 <br /> iHamum,NYgiOGCIXOGI5i5 t APPDCU S[I[NfI51i o y �'� LECTRICAL PANEL DETAIL - Sheaf <br /> - -- -- " - — DRAWN NNM °C No.00419H6 II Stockton, CaliforniaCalifarnia <br /> EXPA-11:3EDa AND TANK DETAILS 7 or 7 <br /> Issue <br /> CHECKED YyIG 41 POAGINEER DATEEmeryville, California 1SEOR ASO <br /> 0 <br /> auwHc Coon Jf EWIMX3966\5966St.DW - <br />