My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1993-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1993-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:16 PM
Creation date
3/31/2020 2:30:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1996
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVINE * FRICKE <br /> {J lffERS,HYDROGEOLOGISTS B APPLIED SCIENTISTS <br /> nFR��IT ��P.V�CF_ -. <br /> September 6, 1996 LF 3966.08-001 <br /> 96 SEP -9 AM 8: 35 <br /> via overnight mail <br /> Ms. Wendy Cohen <br /> Mr. Joel Weiss <br /> State of California <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827 <br /> Subject: Storage and Operations Compound (SOC) Design Plans, Lincoln Center, Stockton, <br /> California <br /> Dear Wendy and Joel: <br /> The attachment to this letter provides the design plans for the Storage and Operations Compound <br /> (SOC) for the Lincoln Center Site. The SOC will be used for decontamination of field equipment <br /> and temporary storage of waste generated during field activities. The design plans are being <br /> submitted in final form for your records; when details regarding Site access and property leasing <br /> have been resolved, the design plans will be submitted to qualified construction contractors for <br /> bidding. The SOC construction will require approximately 21 days to complete. <br /> Please call me if you have any questions regarding this matter. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> cc: Robert C. Thompson, Esq., LeBoeuf, Lamb, Greene & MacRae <br /> John J. Gregory, Esq., LeBoeuf, Lamb, Greene & MacRae <br /> A.J. Birkbeck, Zevnik Horton Guibord & McGovern <br /> Michael C. Donovan, Esq., Zevnik Horton Guibord & McGovern <br /> John Meyer, Esq., Zevnik Horton Guibord & McGovern <br /> Wilbur H. Smith II, Esq., Sims-Grupe Management Corp., Inc. <br /> Anne M. Farr, Ph.D. <br /> Steve Henshaw, Henshaw Associates <br /> Barry Williams, Esq., JAMS/ENDISPUTE <br /> Mary F. Meays, R.E.H.S. <br /> 1900 POWELL STREET, 12TH FLOOR, EMERYVILLE, CALIFORNIA 94608-1811 phone (510) 652-4500 fax (510) 652-2246 <br /> San Francisco Bay Area Sacramento - Irvine San Diego Phoenix Salt Lake City Denver - Chicago -Tallahassee Newark- Honolulu <br />
The URL can be used to link to this page
Your browser does not support the video tag.