My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:36 PM
Creation date
3/31/2020 2:32:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1997
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br /> • <br /> SOLVENTlust north of Benjamin holt Drive. <br /> So Car, drilling crews have <br /> found several pollution hot spots <br /> Continued from et within the boundaries of the cen- <br /> lo contain the pollution — to ter but little or no contamination <br /> keep it from spreading either ver- off site, Bradshaw said. , <br /> licafiy or horizontally before But Ire said . the polluted <br /> eventually removing it from the groundwater "is moving. That's <br /> groundwater basin why were moving aggressively to <br /> The work is being supervised find out where it is." <br /> by San Joaquin County's This summer, probably In <br /> Environmental Health Division August or September, the compa- <br /> and the Central Valley Re�Ional 11Y will begin the first interim <br /> Water Quality Control Board cleanup measures — installation <br /> "There's been quite a bit of of 18 extraction wells along padfic <br /> progress made in the last year," Avenue. The undwater Rows <br /> said Wendy Cohen, a senioreast, so the wells will be designed <br /> neer with the regional board to prevent pollution from spread- <br /> Since March,; crews have ing any farther In that direcilon. <br /> Installed 18 wells with a variety'of , A ion -term, � permanent <br /> depths to look for pollute cleanup <br /> could take years to <br /> complgroundwater both at the center "It's very complex," Rabies said. <br /> and in the surrounding neighbor- , <br /> purr Job is to make sure it's done <br /> hard, said Don Bradshaw project Our <br /> manager for the Levine-Fricke- Bradshaw said engineers haven't <br /> Recon engineering firm. yet decided how the groundwater <br /> They've conducted dozens of will be treated to remove the pol- <br /> other tests, all to try to establish lotion. <br /> how far the plume of conlami- Nor has (lie total cost of the <br /> nated groundwater has spread. cleanup been determined. <br /> Another well was installed "It will be in the millions of <br /> Thursday night In the parking lot dollars," he said. <br />
The URL can be used to link to this page
Your browser does not support the video tag.